Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW

Price $1000000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Shandong, China
Popularity 498 people viewed
Quantity
+-
 

Runh Power Corp., Ltd.

VIP   Audited Supplier 14 years
Profile Certified by SGS/BV
6 MW
380V
Thermal Power Generation
Three Phase
10MW - 100MW
Coal, Gas, Oil, Biaboss etc
Available
RUNH
Standard Packing
15mw POWER
China
8402119000
Product Description
DescriptionCoal Fire Steam Turbine Power Plant
Capacity1MW-100MW
Warranty periodOne year
FuelCoal
ServiceProfessional design, construction, installation and offer the whole complete line of equipments and spare parts
 
Who We Are 
Runh Power is an EPC contractor and complete equipment supplier in China, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 28 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc.
 
What We Offer
1 Professional design institute:
We own independent design institute, about 50 experienced and Professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes. 

2 Cost effective equipment:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipment for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.

3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoid potential delays in delivery.

4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.

5. Second hand equipment
We own abundant second-hand equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipment such as Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipment.
 Our Power Plant Projects

Our Certifications
 

 
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$150000.00 1 Piece(MOQ)

Full Three-Dimensional Ultra-High Pressure Reheating Single-Cylinder 135 150MW Steam Turbine

Runh Power Corp., Ltd.
$1000000.00 1 Piece(MOQ)

Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW

Runh Power Corp., Ltd.
$1500000.00 1 Set(MOQ)

EPC Contractor Power Transmission Line Overhead/Underground

Runh Power Corp., Ltd.
$150000.00 1 Piece(MOQ)

Industrial 100kw Steam Turbine Generator for Electricity Generation

Runh Power Corp., Ltd.
$6.00 100 Pieces(MOQ)

Si-Fe Magnetic Material Orientation Silicon Steel Iron Core by Winding for Electric Power Equipment

Kuretake Electronics (Shanghai) Co., Ltd
$6000.00 1 Set(MOQ)

China Environmental Protection Water Energy

Chongqing Jakenon Technology Company Limited
Negotiable 1 Piece(MOQ)

Power Plant EPC Contractor for Sugar Mill

Runh Power Corp., Ltd.
$50.00 10 Pieces(MOQ)

Nickel-Based Alloy Engine Jet Turbo Steam Turbine Impeller Compressor Wheel

Qingdao OBT Power Co., Ltd.
$178.00 10 Sets(MOQ)

Hydraulic Generator Controller 600W

Chongqing Jakenon Technology Company Limited
$1000000.00 1 Piece(MOQ)

Biomass-Fired Coal- Fired Power Plant 10 MW 15me 20MW 25 MW

Runh Power Corp., Ltd.