Comaccord Building Galvanizd Scaffold Heavy Light Duty Formwork Construction Scaffolding Support Shoring Adjustable Steel Prop

Price $15.40 Compare
Min Order 1692 Pieces
Availability In Stock
Shipping From Fujian, China
Popularity 436 people viewed
Quantity
+-
 

Comaccord (Xiamen) Building Material Co., Ltd.

VIP   Audited Supplier 18 years
Profile Certified by SGS/BV
Steel
Mobile
Multi-Pole Scaffolding
Combined Scaffolding
Floor Type Scaffolding
Single Row Scaffolding
Internal Scaffolding
Horizontal mobile Scaffolding
Scaffolding Props
Building Scaffold
120mm*120mm*6mm
Galvanised, Painted
60mm, 56mm, 48mm
40mm, 48mm
G Type or Line Pin
SGS
13kg
Comacorrd
Steel Pallet
2mm
China
73084000
Product Description
Adjustable prop

steel prop are widely used in different supporting areas. Slab formwork and table formwork with its high loading capacity may meet maximum
stability for your site jobs. Slab thickness up to 300mm.   
 
1.Diameter of inner tube: 40mm,48mm,etc. 
2.Diameter of outer tube:  48m,56mm,60mm etc. 
3.Wall thickness:1.6mm,1.7mm,1.8mm,2mm etc. 
4.Adjustable length:heavy duty 1800-3200mm,2100-3400mm,2200-3900mm ,
  2200-4000mm,3000-5000mm,3500-4000mm etc.       
  light duty 1600-3000mm,1800-3500mm,2000-3500mm etc. 
5.Base plate:120*120*4mm/4.5mm/5mm,150*150*6mm 
6.Shape of base plate:flower or square 
7.Surface : paint,hot dipped galvanized,pre-galvanized,electrical galvanized   
8.Type:with hands cup or open thread 
9.OEM service is available
10.Package:in bundle or in bulk                

Heavy duty prop 

MIN
MAXInner tubeOuter tube
1.8m3.2m48*2.0mm60*2.0mm
2.1m3.4m48*2.0mm60*2.0mm
2.2m4.0m48*2.0mm60*2.0mm
2.4m3.9m48*2.0mm60*2.0mm
3.5m4.0m48*2.0mm60*2.0mm
3.0m5.0m48*2.0mm60*2.0mm

Light duty prop 

MIN
MAXInner tubeOuter tube
1.6m3.0m40*2.0mm48*2.0mm
48*2.0mm56*2.0mm
1.8m3.5m40*2.0mm48*2.0mm
48*2.0mm56*2.0mm
2.0m3.5m40*2.0mm48*2.0mm
48*2.0mm56*2.0mm




 Our Advantages

1) We have our own steel pipe production lines, which provide raw material for steel props. Thus can control the quality and delivery time better.

2) Professional welding engineers with more than 10 years welding experience for high quality welding

3) QC team to do the inspection for sizes, thickness, welding part and surface during in-line production and final packing

4) 15 years experience in Steel Pipe and Scaffolding field, and rcih cooperation experience with heavy buyers

5) Fast delivery


Packaging & Shipping


FAQ
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed  products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly. 


2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet. 


3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100  workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory  is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current   situation.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$14.13 1 Piece(MOQ)

Comaccord Furniture Pine Plywood Bb Grade Triplay Playwood 4X8

Comaccord (Xiamen) Building Material Co., Ltd.
$30.50 800 Square Meters(MOQ)

Smoked Oak Engineered Wood Parquet Floor with Rustic Grade

Comaccord (Xiamen) Building Material Co., Ltd.
$210.00 45 M3(MOQ)

Comaccord OSB 2 Cheap 1220X2440mm Waterproof OSB 2 and OSB 3 Board

Comaccord (Xiamen) Building Material Co., Ltd.
$16.75 1840 Pieces(MOQ)

Comaccord 27mm Waterproof WBP Glue Yellow Pine Board Formwork 3ply Panels

Comaccord (Xiamen) Building Material Co., Ltd.
$21.00 1000 Pieces(MOQ)

Steel Jack Post Shore Scaffolding U-Head Jack Heavy Lifting Jacks

Rizhao Fast & Fasten Scaffold Co., Ltd.
$12.00 200 Pieces(MOQ)

Hot DIP Galvanized Steel Quickstage Scaffolding 48.3mm Heavy Kwikstage System Scaffold

Foshan Scaffoldinghome Co., Ltd.
$30.00 1 Piece(MOQ)

Bueno 1.7m/1.9m Height Door Frame Mobile Walk Through Ladders H Frame Scaffold

Qingdao Bueno Import & Export Co., Ltd.
$8.00 1000 Pieces(MOQ)

Adjustable Scaffolding Steel Shoring 60/48mm Heavy Duty Galvanized Support 1.6mm High Quality Support

Jinan Taigang New Material Co., Ltd
$900.00 1 Ton(MOQ)

High Quality Steel Ringlock for Mobile Scaffold System Scaffolding Connection Accessories

Hunan INNO New Materials Technology Co., Ltd.
$7.90 1000 Pieces(MOQ)

China Factory Scaffolding System HDG Seamless Pipe Hot Sale 48.3 3.2mm Construction Building Galvanized Steel Tube

Bythai Scaffolding Co.,Ltd.