Comprehensive Utilization of Waste Heat and Waste Pressure for Power Generation

Price $10000000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Anhui, China
Popularity 469 people viewed
Quantity
+-
 

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
1MW~60MW
Global After-Sales Service
12 Months After Supply
1MW-60MW
Synchronous Generator
CCC, ISO, TLC, CE
Nonstandard
Impulsive
Comply with Standards
Steam
Electro-Hydraulic Regulation
Anhui Zhengyufeng
Sea and Land Transport
Different power
Wuhu, Anhui, China
Product Description

Product Description

1. In the production process of high-energy-consuming industrial enterprises, a considerable amount of waste heat and pressure is wasted; it is mainly divided into heat sources and calorific value waste in kilns, ore-fired furnaces, reactors, temperature and pressure reduction devices and other production processes, collectively referred to as waste heat and pressure resource waste.
2. Our company can equip different energy-saving technology transformation plans according to the different actual waste heat and pressure waste of the owner, equip waste heat boilers to convert calorific value to produce steam, and then equip condensing or back-pressure steam turbine units to generate electricity or drive equipment, directly generating economic benefits. The power generation project is built as a self-provided power station within the owner's enterprise, and all the electricity generated is used for the owner's production or lighting.
3. Product life: The design service life of the main parts is not less than 30 years.

Detailed Photos

Product Parameters

Steam turbine parameters

modelPower(MW)Steam inlet parametersSteam consumption(kg/kw.h)Steam intake(t/h)Speed(r/min)
  Pressure(Mpa)Temperature(ºC)   
B1.5-2.35/0.491.52.3539013.33206500/3000
B3-3.43/0.4933.4343593829.46500/3000
B3-4.9/3.134.947037.7113.13000
B4.5-8.83/2.24.58.8353512.254.96500/3000
B6-0.98/0.24560.98128016.096.03000
B6-4.9/0.98164.947011.166.63000
B7-4.9/0.774.94709.5566.93000
B7-8.83/3.6378.8353518.571303000
B9-4.9/0.4994.94707.9071.13000
B12-4.9/1.27124.947012.081453000
B15-4.9/0.98154.947010.30154.53000
B25-4.9/0.98254.947010.25256.33000
B30-4.9/0.98304.947010.18305.43000
B10-13.1/6.91013.153524.62403000
 
modelPower(MW)Steam inlet parametersSteam consumption(kg/kw.h)Steam intake(t/h)Speed(r/min)exhaust pressure
(Mpa)
  Pressure(Mpa)Temperature(ºC)    
N1.2-0.1551.20.1551959.7611.7130000.007
N4-0.8840.882806.52630000.008
N6-3.4363.434354.627.630000.0076
N15-4.9154.94703.9559.2530000.007
N25-8.83258.835353.5889.56500/30000.006
N15-3.43154.94704.161.530000.007

 
modelPower(MW)Steam inlet parametersPumping      parametersSteam consumption(kg/kw.h)Speed(r/min)exhaust pressure
(Mpa)
  Pressure(Mpa)Temperature(ºC)Flow
(t/h)
Pressure(Mpa)Flow
(t/h)
   
CB15-3.43/0.98/0.53153.43435150.20.98201030000.53
CB14.1-4.9/3.0/0.914.14.947015031210.63830000.9
CB15-4.9/1.57/0.49154.94352001.575013.3330000.49
CB13.6-4.9/2.5/0.9813.64.9470152.62.51211.2230000.98
CB10-6.4/1.36/0.49106.44351001.36151030000.49
CB10-8.83/0.98/0.6108.83535750.98257.530000.6
CB25-8.83/2.8/0.98258.835352192.8708.7630000.98
CB30-9.2/3.0/0.8309.2535239.53607.9830000.8
CB18-9.2/2.8/0.98189.2535160.22.8408.930000.98
CB16-12.7/2.5/1.761612.75351522.5359.530001.76
C15-3.43/0.98153.43435101.50.98456.7630000.007
C15-6.5/1.2156.5470105.31.2757.0230000.007
C15-8.83/0.98158.83535900.98 45630000.007
 
Generator parameters
dynamoExciter
modelcapacityVoltagePower FactorefficiencypowerVoltage
 KVAV %KWV
QFK-3-237506300
3150
0.895.330100
QF-3-2375010500
6300
0.895.330100
QF-6-2750010500
6300
0.896.445150
QF-7-2875010500
6300
0.89745150
QF-12-21500010500
6300
0.89765230
QF-15-21875010500
6300
0.89765230
QF-25-23125010500
6300
0.897.4105230
QF-30-23750010500
6300
0.897.6105230

FAQ

1. Question: How to determine product parameters?
Reply: Design steam turbine units with different working conditions according to the customer's current production technical parameters to meet production needs.
2. Question: How to determine product quality?
Reply: You can do it through on-site field visits and provide relevant inspection and testing reports and other materials.
3. Question: How to ensure after-sales service?
Reply: The company's technical staff solves difficult problems online and offline.

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$10000000.00 1 Piece(MOQ)

Steam Turbine Driven Pump and Compressor Equipment Project

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$3000000.00 1 Piece(MOQ)

Back Pressure Steam Turbine Generator Used to Generate Electricity in Power Plants

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$3000000.00 1 Piece(MOQ)

B1.5high-Efficiency Back-Pressure Steam Turbine Generator Sets for Industrial Applications

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$10000000.00 1 Piece(MOQ)

High Speed, High Efficiency, Mature Process Steam Turbine Generator

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$19999.00 1 Piece(MOQ)

300kw, 450kw, 500kw, 550kw, 700kw Small Steam Turbine for Power Generation

Zbgreat Imp&exp Co., Ltd.
$3000000.00 1 Piece(MOQ)

Second-Hand Steam Turbine Generator Set

Anhui Zhengyufeng Energy Saving Technology Co., Ltd.
$108100.00 1 Set(MOQ)

EPC Power Plant/Hrsg/CHP/Cogeneration/Steam Turbine Generator/Synchronous/Asynchronous Generator

Shandong Chenyang Power Technology Corporation Limited
$300000.00 1 Piece(MOQ)

Single Layer Back Pressure Steam Turbine Generator

Anhui Xinning Equipment Co., Ltd.
$19999.00 1 Piece(MOQ)

High Quality Steam Generator with Best Price Factory Direct Sell High Efficiency Steam Turbine

Zbgreat Imp&exp Co., Ltd.
$200000.00 1 Piece(MOQ)

1X6.8MW Steam Turbine with Generator Set and Auxiliary Equipment of Coal Power Plant

Ningbo Hyuan Power Industry Co., Ltd.