

| Frequency | 50Hz /60Hz(1500RPM/1800RPM) | ||
| Voltage | 440V/415V/400V/380V/240V/230V/220V/200V | ||
| Cooling way | Water cooled,Air cooled | ||
| Breaker | ABB,CHINT,Delixi | ||
| ATS | Optional - (AISIKAI) | ||
| engine | generator power by Cumnins,Deutz,Kubota,Yanmar,Mitsubishi,Doosan,Weichai,Baudouin,KOFO,Shangchai,Yuchai, Faw,Yangdong,Quanchai,Yunnei | ||
| Alternator | Stamford,Leroy Somer,Meccalte,Dongchai,Kanpor | ||
| Controller | ComAp,Deepsea,Smartgen,Datakom |







1 year or 1000 working hours, whichever comes first. After expiration, provides cost maintenanceservice description within the guarantee period
12 months . If the quality problem arise during the warranty period,and verified the problem is caused by our genset-body instead of external or natural reasons. (Refer to all kinds of natural disaster, shipping, loading, unloading, wrong-operation, etc), we will supply the relevant spare parts free of charge for spare parts (Shipping not included). But not including quick-wear parts,(such as water tank, gasket, AVR, bridge group, brush, air breaker,meters, and so on.)
6 months warranty for start motor,charging alternator,injector,controller and water heater. (Shipping not included)
Q1: What is your generator MOQ? A: 1 set.
Q2: What is the lead time?
A:20 days after receiving your deposit.But if your order is some special engine and alternator, then the delivery time is longer.
Q3: Is it able to make customer's own brand?
A: Yes,but need your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight.
Q6: What the size of your factory?
A:Dongchai has 14800SQM and 80 staffs.








Audited Supplier










