Main Blank Process | Die Casting, Permanent Molding /Gravity Casting, Low Pressure Casting, High Pressure Casting ,sand casting,investment casting,lost foam casting etc. |
Material | Carbon Steel, Stainless Steel, Aluminum Alloy ,Brass Alloy ,Zamak 3, Zamak 5, Zamak 7, Zamak 2, Or according to customer requirements |
Casting Blank Size | 2 mm-1500mm / 0.08inch-60inch , or according to customer requirements |
Surface Finish | Zinc/Chrome Plating, Anodizing,Powder Coating,Electrophoretic painting etc. |
Process | CNC centre,CNC lathe,General lathe,General Milling, CNC milling, Drilling machine, internal grinder.Cylindrical grinder machine,centerless grinder machine & other equipments. |
Machining Tolerance | From 0.005mm-0.01mm-0.1mm |
Machined Surface Roughness | Ra 0.8-Ra3.2 according to customer requirement |
Application | Many industries, especially in household appliances,electrical heated tube element,switch accessories,auto spare parts,thermostat accessories,medical equipment hardware fittings. |
Lead Time | 45 days for mold and samples, after confirmation of samples, mass production time is 35 days |
Small Quantity | Is acceptable |
Tolerance | CT4-6 for Permanent Molding, Die Casting |
Quality Control | Full Inspection |









For more details,pls feel free to contact us.
24hours and quick reply for you.