Custom Steel Formwork for Adjustable Columns

Price $1050.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Beijing, China
Popularity 497 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our steel formwork system is the epitome of strength and durability, making it a perfect choice for reusable applications in construction. Its ease of assembly and erection, coupled with a fixed shape and structure, renders it ideal for projects requiring multiple identical structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, subject to confirmation prior to loading.
2. We employ various packaging methods tailored to different products:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged before being placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Certain irregular items are loaded in bulk within the container.
Delivery:
1. Production: For a full container, standard production time is 20-30 days following receipt of the customer's down payment.
2. Transportation: The duration depends on the destination charge port.
3. Special requirements can be negotiated as needed.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a specialized stencil-making company, operating out of two dedicated factories.

Q2: What is your main business?
A: We excel in designing and manufacturing formwork products specifically forbridges and tunnels.

Q3: What services do you offer?
A: We provide valuable suggestions, detailed formwork layout drawings, and competitive quotations for construction projects to owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers by supplying them with our exceptional formwork products.

Q4: How long does it take to draft a preliminary design and quotation after we submit structural drawings?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products ordered.

Q6: What are your payment terms?
A: We require 30% T/T in advance, with the balance due before shipment.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1050.00 1 Ton(MOQ)

Viaduct Structural Column Steel Formwork System

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Steel Formwork System for Bridge Construction

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Heavy-Duty Steel Formwork for Bridge Columns

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Steel Column Formwork for Building Bridges

Beijing Aoyu template Co., Ltd.
$3.00 700 Pieces(MOQ)

Interlock Paving Mould Plastic Precast Concrete Moulds for Paving The Road

Jiaxing Wangzu Industrial Co., Ltd.
$25.80 500 piece(MOQ)

18mm Plastic Plate PVC Blue Plastic Formwork for Construction

Linyi Huge Wood Co., Ltd.
Negotiable 10000 Pieces(MOQ)

Formwork Accessories Tie Rod Rar Rapid Wedge Clamp Anchor Nut Concrete Formwork Scaffold Building Materials

Nanjing Wellmade Metalwork Co., Ltd.
$25.80 500 piece(MOQ)

12mm 15mm 18mm Solid Plastic Formwork Concrete Retaining Wall Plate

Linyi Huge Wood Co., Ltd.
$56.69 100 Square Meters(MOQ)

Concrete PVC Plastic Building Formwork for Construction 10cm Wide

Hebei Leige Technology Development Co., Ltd.
$1.00 10000 Pieces(MOQ)

Construction Steel Formwork Stud Pin Accessories Wedge Dowel Pin Split Pins

Handan Guojing Fastener Manufacturing Co., Ltd