Customized Granular Activated Carbon Absorption Regeneration Waste Gas Treatment

Price Negotiable Compare
Min Order 1 Set
Availability In Stock
Shipping From Jiangsu, China
Popularity 259 people viewed
Quantity
+-
 

Eascle Environmental Technology(Jiangsu) Co., Ltd

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
DN1500
Lifetime
1 Year
New
ISO
Automatic
Chemical Treatment
Q235B
99.99%
Ral7032 / Customized
1590-3180
6/6mm
3.5 Cbm
EASCLE / customized
Wooden Packing & Wooden Pallet
1500*2750mm
Suzhou, China
Product Description
Detailed Photos

 

 

Product Description

Working Principle

1.Adsorption Stage
 
Physical Adsorption:
The waste gas passes through a GAC bed, where organic          pollutants (e.g., VOCs) are trapped on the surface and within the micropores of the GAC through van der Waals forces.


Chemical Adsorption (Optional):
Chemically modified GAC may adsorb specific contaminants through chemical reactions, improving treatment efficiency for targeted pollutants.


 
2.Regeneration Stage
 
Once the GAC becomes saturated with adsorbed pollutants, it is regenerated to restore its adsorption capacity.

Common regeneration methods include:
Thermal Regeneration: High-temperature desorption volatilizes the adsorbed contaminants, which are then treated or collected.
Steam Stripping: Steam passes through the GAC bed, desorbing the pollutants for recovery or destruction. 
Vacuum Desorption: Avacuum reduces the pressure, lowering the boiling points of the adsorbed pollutants for removal.
 
Product Feature

Working Process

1.Waste Gas Collection
Polluted air is collected from the emission source via a ducting system and directed into the GAC adsorption tower.
 
2.Pre-treatment (Optional)
If the waste gas contains particulates, oils, or excessive moisture, pre-treatment devices (e.g., filters, scrubbers) are used to protect the GAC from clogging or degradation.
 
3.Adsorption Stage
The waste gas flows through the GAC bed in the adsorption tower, where organic pollutants are adsorbed.
Clean air exits the tower and is discharged into the atmosphere after meeting regulatory standards.
 
4.Breakthrough Monitoring
Sensors monitor the adsorption performance. When the GAC is saturated (breakthrough point), the system signals the need for regeneration.
 
5.Regeneration Stage
The saturated GAC is regenerated in situ (within the system) or ex situ (removed and regenerated elsewhere).
 

 

Product Parameters
 
Equipment ModelEquipment Size, mmApplicable Air Volume, CMHApplicable Concentration, mg/m³Equipment Thickness, mmMax Activated Carbon Filling, m³
DN1500DN1500×27501590~3180≤16666/63.5
DN2000DN2000×30002826~5652≤16666/66.2
DN2400DN2400×32004080~8160≤16666/69
DN2600DN2600×33004776~9552≤16666/810.6
DN2800DN2800×34005539~11078≤16666/812.3
DN3000DN3000×36007236~14472≤16668/1016
DN3200-WDN3200×40007922~15844≤16666/618.5
DN3200-WDN3200×45009526~19052≤16666/620
DN3200-WDN3200×500011234~22469≤16666/813
DN3200-WDN3200×550015840~22480≤16668/1020
DN1500DN1500×27501590~3180≤16666/63.5
DN2000DN2000×30002826~5652≤16666/66.2
DN2400DN2400×32004080~8160≤16666/69
DN2600DN2600×33004776~9552≤16666/810.6
DN2800DN2800×34005539~11078≤16666/812.3
DN3200DN3200×36007236~14472≤16668/1016
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
Negotiable 1 Set(MOQ)

Customized Granular Activated Carbon Absorption Regeneration Waste Gas Treatment

Eascle Environmental Technology(Jiangsu) Co., Ltd
Negotiable 1 Set(MOQ)

Advanced Waste Gas Co Catalytic Combustion Treatment System with PLC Control

Eascle Environmental Technology(Jiangsu) Co., Ltd
Negotiable 1 Set(MOQ)

High Airflow Matched Waste Gas Treatment Equipment Scrubber, Spray Tower

Eascle Environmental Technology(Jiangsu) Co., Ltd
Negotiable 1 Set(MOQ)

Eco-Friendly Sintered Plate Dust Collector for Air Quality Lmprovement

Eascle Environmental Technology(Jiangsu) Co., Ltd
$6000.00 4 Pieces(MOQ)

Customized Steel Scrap Bins Waste Containers Hook Lift Bins

Hero Equipment (Yangzhou) Co., Ltd.
$9000.00 1 Piece(MOQ)

Wfs-500 Solid Waste Incinerator, Waste Management Incinerator

Shandong Better Environmental Protection Technology Co., Ltd.
$60000.00 1 sets(MOQ)

Flue Gas Treatment Equipment Flue Gas Purification Plant

Shandong Baolan Environmental Protection Co., Ltd.
$19000.00 1 Set(MOQ)

50/100/200/300/500 Kgs Smokeless Incinerator Furnaces for Industrial Medical Hospital Clinical Domestic Solid Waste Sewage Treatment Sludge

Qingdao Oyang Machinery Equipment Co., Ltd.
$2800.00 1 Piece(MOQ)

Industrial Transport Customized Heavy Duty Hook Bin Standard Australian Hooklift Crane Bin Steel Dumpster Bin Hook Lift Container for Construction Waste Collect

Hebei Huachen Machinery Manufacturing Co., Ltd.
$585.00 12 Pieces(MOQ)

Dry Flammable Waste Treatment Wooden Furniture Tyre Incinerator

Jiangxi Dongsheng Intelligent Equipment Group Ltd.