The pneumatic DTH rock blasting drilling rig DM100A is high powered with easy operation system. It could be applied in open mine, water and electricity projects, railway and highway construction project. Within rock hardness range f=8-16, it can reach a higher drilling speed; the rubber hose braided with steel wire could bear high pressure; anchor holes could use on the two sides of slides by the M42X10X1.5 screw holes, which also could be used to fix optional (XQ) sled bearing drill holes 0 ° -90 °; or work with vertical shaft underground and Channel drilling 0°-360°borehole and ventilation, drain holes. It is really a grear helping hands for you to improve efficiency.
| MODEL | DM100A | DM100B |
| Air pressure(Mpa) | 0.5-0.7 | 0.5-0.7 |
| Hole diameter(mm) | 75-130 | 75-130 |
| Air consumption(m3/min) | 9-17 | 6-12 |
| Hole depth(m) | 20 | 20 |
| Feed Stroke(m) | 1 | 1 |
| Lifting power(N) | 600 | 600 |
| Rotation Speed(r/min) | 0-80 | 110 |
| Rock hardness | f=8-16 | f=8-16 |
| Drive mode | Wind motor | Motor(Electricity) |
| Rated power(kw) | 4 | 4 |
| Drill pipe | 50×1000mm | 50×1000mm |
| Size | 2700×450×630 | 2700×420×610 |
| Weight(kg) | 245 | 300 |









Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. | A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. | A: 365×24 Year-round Service | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |

CTWD CWD200 Crawler Type Drilling Rig for Drilling 200m | TWD![]() TWD TWD200 Trailer Type Drilling Rig for Drilling 200m | ![]() CSD300A Truck Type Drilling Rig for Drilling 300m |








Audited Supplier










