Early Stripping Head Steel Panel Floor Formwork for Building Concrete Construction

Price $100.00 Compare
Min Order 500 Pieces
Availability In Stock
Shipping From Shandong, China
Popularity 315 people viewed
Quantity
+-
 

Shandong Prima Construction Formwork Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
  • Shandong, China
  • Jack Zhang (Mr.)  
    Boss
GF
One Year
ISO, CE
Steel
Slab Formwork
30% Deposit,70% Should Be Paid Before Shipment
Q355b
GF
Green/Customized Color
8480600000
GF
Bundle
China
8480600000
Product Description
Panel - Prop early stripping Green Formwork System  -  Steel Formwork
Product Description
There are 3 basic components in Green Formwork System:
 
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
 
Product Parameters

 

 
 
Model NumberSize(mm)weight(kgs)
MB18121800x120045
MB1891800X90039
MB1861800X60031
MB15121500X120041.4
MB1591500X90033.3
MB1561500X60025.8
MB12121200X120034
MB1291200X90028
MB1261200X60023
MB99900X90023
MB96900X60019
MB66600X60014.3


 
Our Advantages

SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 

EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. 
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
 
 Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
Packaging & Shipping

 

 
Installation Instructions

 

Certifications

 

If you have projects in hand ,please do not hesitate to contact us.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$55.00 500 Pieces(MOQ)

Advanced Modular Scaffolding for Facade

Shandong Prima Construction Formwork Co., Ltd.
$5.00 2000 Pieces(MOQ)

Kwik Scaffolding System

Shandong Prima Construction Formwork Co., Ltd.
$5.00 2000 Pieces(MOQ)

Aluminium Scaffold-Deck/Cross Beam/Staircase

Shandong Prima Construction Formwork Co., Ltd.
$100.00 500 Pieces(MOQ)

Quick Realse Table Type Green Formwork

Shandong Prima Construction Formwork Co., Ltd.
$180.00 100 Square Meters(MOQ)

Kitsen Modular Shear Concrete Wall Formwork for Sale

Kitsen Technologies Co., Ltd.
$100.00 500 Pieces(MOQ)

Quick Realse Table Type Green Formwork

Shandong Prima Construction Formwork Co., Ltd.
$70.00 1000 Meters(MOQ)

Adjustable Plastic Slab Reusable Formwork with Push Pull Prop

WUXI TOTAL CONTEC METAL INDUSTRIES CO.,LTD
$58.00 2 pieces(MOQ)

Shuttering Magnets System Side Forms Holding Magnets

Ningbo Wewin Magnet Co., Ltd.
$6.00 2000 Meters(MOQ)

Zulin High Bearing Capacity Timber Beam H20

Beijing Zulin Formwork & Scaffolding Co., Ltd
$68.50 150 Square Meters(MOQ)

Reusable Fiber Glass Plastic Formwork (TP60)

Suzhou TECON Construction Technology Co., Ltd.