Container house
1heat&sound insulation
2container house with electricity, water supply
3easy to install, dismantle, transport
Materials:
EPS/rock wool/glass fibre sandwich panel for wall and roof.
C section steel, square steel tube, V section steel for frame steel structure.
Aluminum alloy shutter window and the plastic-steel for window.
EPS/rock wool/glass fibre sandwich panel/steel/plastic steel/wooden/aluminum alloy door.
High-strength bolts and other components.
Futures:
Connection method: Welding.
Anti-distortion, earthquake, wind and load.
Steel structure with service life over 50 years.
Steel anti-corrosive.
Maximization of available constructing space.
Surface treatment: Static powder coating spray/Zinc galvanized/anti-corrosion finish paint.
Services:
Reduce cost by integrating &manufacturing &service processes.
With reliable quality and efficient service.
Can offer one-stop service from developing, design, manufacturing to installation...
Sizes and design as requirements.

| Detailed description of Economic movable modular container house(20ft or 40ft) | ||
| Dimension | Length | customer designed |
| Width | customer designed | |
| Height | customer designed | |
| Weather condition | Wind speed | m/s or km/h |
| Snow load | kg/m2 | |
| Earthquake | degree | |
| Life span | 25-50 years | |
| House | Steel Frame | Q235, panited or HDG |
| Wall panel | EPS, Glass wool, Rockwool, PU, etc sandwich panel | |
| Heat Insulation THK.:50-150mm; Steel sheet THK. :0.3-0.7mm | ||
| Roof panel | EPS, Glass wool, Rockwool, PU, etc sandwich panel | |
| Heat Insulation THK.:50-150mm; Steel sheet THK. :0.3-0.7mm | ||
| Door | Sandwich door; PVC door | |
| Window | PVC sliding window;Aluminum alloy sliding window | |
| Surface | Panited surface | Antirust paint,total thickness: 100-120um; Warranty period: 18-20 years |
| Hot dip galvanized surface | 65,86um; Warranty period: 45-50 years | |
| Accessories | Hydroelectric system | Hydroelectric plan |
| Ventilation system | Providing design | |
| Floor | PVC floor; Plywood floor | |
| Heating system | Providing design | |
| Delivery time | 20-25days | |
| Shipment | One 40HQ container for loading about 160-250m2 | |








Audited Supplier










