Excavator Hydraulic Breaker Parts Aux Standby Control Valve Backup Valve for PC60 PC70 PC200-6 PC200-8 PC120-6 PC160-7

Price $150.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Shandong, China
Popularity 266 people viewed
Quantity
+-
 

Jinan Changhao Machinery Equipment Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
  • Shandong, China
  • Jnchanghao (Ms.)  
    Sales Manager
PC60 PC70 PC200-6, PC200-8 PC120-6 PC160-7
1 Year
Excavator Relief Valve Standby Valve
Excavator
CE, ISO9001: 2000
New
Cast Iron
High Guarantee
in Stock
Within 10 Days
HWX or OEM
Wooden Case
standard
China
8481803990
Product Description
Product Description

 

Excavator PC70 PC200 PC 210 PC220 standby valve hydraulic control valve for hydraulic breaker hammer
PC200/300/400 Spare Valve Installation Instruction
1. The pipeline must use pickling phosphating tube to prevent valve core sticking to damage valve rod.

2.The aluminum cover of jint is M14*1.5,power slightly to prevent falling off due to tight-ening.
3.Because the gap of valve rod and valve body is small it ill get stuck valve rod if you use too much force to tighten the
screw.If the valve core is stuck,just please loosen four screws.
4.PC200/300 spare valve is reverse thrust,so the oil inlet of pilot valve is in thehydraulic tank level,the mainoil low is
in the driving cab level.
Noted:Installation Location of Sensor
PC200-6/-7 excavator:Install below empty filter which have a line and have sensor plug.Using sensor"T"to connect
sensor,oil iniet guide tube of pedal valve and oil inlet guide tube of spare valve.(Prepare one piece of 1.5 meter tube of spare
valve by yourself).The sensor of 30Ton excavator located in the gap of excavator frame and cab sde.
PC-8 excavator:using sensor "T"insalled on port A of pedal valve.
5.Above 30T excavator, we advise that the oil return to radiator not to valve and oil tank.
Part name
Excavator Hydraulic backup standby control valve for hydraulic breaker hammer
Model
PC35, PC40, PC70, PC120-8,PC130-8,PC160-7,PC200, PC210, PC220 etc.
How to buy
Tell us your excavator model and type, we confirm solution.
Place of Origin
China
Detailed Photos
 

 

Other Products

 

Company Profile

Jinan Changhao Machinery Equipment Co., Ltd. located in Workshop 24, East End of Gangyuan Second Road, No. 33688, Jingshi East Road, Jinan Area of China(Shandong ) Pilot Free Trade Zone, Jinan, Shang dong, China. The workshops occupy an area of 3,000 square meters. The bonded area is supported by national preferential policies and resources are inclined. There is superior terrain, beautiful environment and convenient transportation.
Our company specialized in manufacturing all kinds of hydraulic breaker hammer,breaker hammer pipeline and their accessories as well as excavator attachments, breaker parts has hydraulic breaker piston, Front & Back head, cylinder, Thrust & Outer bushings, Hammer drill rod and flat pin, Valve and valve, code Seal housing and so on. All the accessories of our pipeline, including clamps, ball valve, foot valve, wire plug, wire alignment, relief valve, lock valve, bracket, connector, hammer tube, arm iron pipe assembly, three-way iron pipe, are independently developed and manufactured by our factory to ensure product quality, safety and reliability. We have perfect production equipments and test devices.

Our company has various international certifications and adopts advanced technology to ensure product quality. We strictly control the material of our products, adopting unique heat treatment technology, special alloy materials, and the quality has reached international advanced level.
Similar products

FAQ

1. What's the MOQ?
1 piece .
2. How about the delivery time?
Based on order quantity, normally it takes 7 days for production. Only 3 days if we have stock on your request size.
3. How many years have you been producing hydraulic breakers and parts?
Over 20 years.
4. Quality & Service:
There will be strict inspection and testing for every order before shipping out.
Our sales team and Technical Support will response for your question within 24 hours (Holidays Excluded).
Free replacement will provide once the failure confirmed caused because of our product quality.
5. What's the payment term?
T/T (Telegraphic Transfer) or Western Union. Pictures of products and packages will be sent to our customers before balance is paid.
6. Can you produce according to customers' design?
Yes, we can do customized products.
7. How about the package?
Standard exporting package.

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$50.00 1 Piece(MOQ)

Excavator H Link Cat 303 E320 H Link Excavator I Link Bucket H Link

Jinan Changhao Machinery Equipment Co., Ltd.
$3500.00 1 Set(MOQ)

Factory Supply Price Excavator Hammer Sb70 Hydraulic Breaker Rock Breaker

Jinan Changhao Machinery Equipment Co., Ltd.
$3500.00 1 Set(MOQ)

New Material Sb70 Hydraulic Hammer Excavator Rock Breaker for Construction Mining

Jinan Changhao Machinery Equipment Co., Ltd.
$90.00 1 Piece(MOQ)

Case 580L Backhoe Spare Parts Backhoe Loader Hydraulic Flow Divider Valve

Jinan Changhao Machinery Equipment Co., Ltd.
$3000.00 1 Piece(MOQ)

High Performance Th18 Mini Crawler Excavation for Digging

Jining Sun Machinery Co., Ltd.
$22.00 1 Piece(MOQ)

Milling Holder Tool Bit 2198001 2198002 Carbide Holder

Suzhou Benit Machinery Technology Co., Ltd.
$200.00 1 Piece(MOQ)

Sb10 Sb35 Sb45 Sb50 Sb100 Sb121 Sb130 Sb151 Excavator Hydraulic Breaker Hammer Side Bolt Through Hole Nuts

Maanshan Break All Heavy Industry Machinery Co., Ltd.
$3000.00 1 Piece(MOQ)

Triangle Rubber Track System for Wheelchair Heavy-Duty Rubber Crawler Triangle Assembly for Tractor Harvester

Shandong Bolin Machinery Co., Ltd.
$120.00 1 Piece(MOQ)

High Quality Rocker Arm Excavator Spare Part

Fujian LianRulin Technology Co., Ltd.
$88.00 10 Pieces(MOQ)

China Ex-Factory Price Small Tolerance Trailer Drive Axle Spindle

Jinan Mingchang Manufacture Co., Ltd.