Fabric Building, Storage Warehouse, Tent, Bus Shelter

Price $5000.00 Compare
Min Order 1 Set
Availability In Stock
Shipping From Shandong, China
Popularity 498 people viewed
Quantity
+-
 

Qingdao Shenghe Steel Pipe Products Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
SH-RO2540
Steel Structure
Warehouse, Temporary Offices, Workshop
SGS
Cenico
Metal Crate
Product Description
>>> Commercial Fabric Building can easily accommodate RVS, tractors, trailers and all large equipment and vehicles.
Features:
1) Top quality heavy duty steel frame.
2) Covers are long life UV resistant , Fire Retardant PVC with Fabric Backing.
3) Dimension :  9.2 X 7.6 X 4.6M 
               12.2 X 7.6 X 4.6M
               15.2 X 7.6 X 4.6M
 We can make any size you need.


  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$3000.00 1 Set(MOQ)

Engineered Container Shelter with Patent

Qingdao Shenghe Steel Pipe Products Co., Ltd.
$5000.00 1 Set(MOQ)

Fabric Building, Storage Warehouse, Tent, Bus Shelter

Qingdao Shenghe Steel Pipe Products Co., Ltd.
Negotiable 50 Sets(MOQ)

Dock Boat Shelter (SH-DS938)

Qingdao Shenghe Steel Pipe Products Co., Ltd.
Negotiable 100 Sets(MOQ)

Mini Carport

Qingdao Shenghe Steel Pipe Products Co., Ltd.
$80.00 100 Square Meters(MOQ)

Pefabricated Easy Installation Building Steel Structure for Building Warehouses

Foshan TianPuAn Building Materials Technology Co., Ltd.
Negotiable 5 Sets(MOQ)

Temporary Shelter (SH-RO3040)

Qingdao Shenghe Steel Pipe Products Co., Ltd.
$50.00 100 Square Meters(MOQ)

Build a Short, Durable, and Sturdy Prefabricated Steel Structure Warehouse

Joinedfortune Technology (Shenyang) Co., Ltd.
$80.00 500 Square Meters(MOQ)

Prefabricated Prefab Hospital Hotel Restaurant Exhibition Hall Stadium Industry Commercial Agricultural Public Building H Beam Heavy Light Steel Structure Frame

Qingdao Chengchuan Construction Engineering Co., Ltd
$70.00 1 Square Meter(MOQ)

Q235B Modular Heavy Prefabricated Metal Light Steel Structure Pre-Engineered Steel Frame Building Construction Fabrication Structure Buildings

Shandong Tianxiang Steel Structure Construction Co., Ltd.
$8000.00 1 Set(MOQ)

Smart LED/LCD Bus Stop Shelter (HS-BS-S001) -Average Lead Time One Month

Guangzhou Huasheng Metal Materials Co., Ltd.