Full Automatic 3 In 1 200ml-2000ml PET Bottle Water Filling Machine/ A To Z Turnkey Project Bottle Water Production Line Machine

Model | CGF8-8-4 | CGF14-12-5 | CGF16-16-5 | CGF24-24-8 | CGF32-32-10 | CGF40-40-12 | CGF50-50-15 |
Capacity (BPH) | 1000-2000 | 3000-5000 | 6000-8000 | 8000-12000 | 12000-15000 | 16000-20000 | 20000-24000 |
Power supply | 2.2kw | 2.42 KW | 3.12 KW | 3.92 KW | 3.92 KW | 5.87 KW | 7.87 KW |
Overall dimension | 1830x160x2050 | 2360×1770×2700 | 2760×2060×2700 | 2800×2230×2700 | 3550×2650×2700 | 4700×3320×2700 | 5900×4150×2700 |
Weight (KG) | 2100 | 2500 | 3500 | 4200 | 5500 | 6800 | 7600 |
NAME | BRAND | AREA |
PLC | Siemens | Germany |
INVERTER | Siemens | Germany |
CONTACTOR | Siemens | Germany |
TOUCH SCREEN | Siemens | Germany |
INVERTER | Siemens | Germany |
MOTOR | ABB | SWISS |
PNEUMATIC PARTS | FEST.O | GERMANY |
ELECTRICAL PARTS | SCHNEIDE.R | FRANCE |

Beverage Machinery-Equipment characteristics:
1. Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough..
3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose.
5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company.





Features:
1. "No Bottle - No Fill" system. Machine construction in SS 304 material.2. Diving Nozzle for Foam free filling.
3.Very High Fill Accuracy.
4. Automatic In-feed and Exit of Bottles.
5. Minimum Change Over time.
6. Unique Free Spinning Bottle Separator- No pneumatic operation.
7. Built-in A.C. Variable Frequency Drive System.
Full Line Bottling Mineral Water Filling Machine Drinking Water Plant Project
Full Line Bottling Mineral Water Filling Machine Drinking Water Plant Project
Exported to more than 60 countries, our annual production capacity is over 3,600 machines,10 skilled after-sale service engineers to offer positive and professional service for all customers all over the world. All machines will be aged testing 7 days by 24 hours before shipment to make ensure running perfectly in customer's production.
We are high-tech enterprises, having rich experience of O D M and O E M. We take into account easy to operate, easy to disassemble, easy to clean, small investment stable performance.
Automatic liquid plant water bottling and capping machine production line bottle water filling machine
1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality,specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4. After sales
After checking, we offer 2 years as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If the problems are still can not solve, we will arrange technician to your factory solving the problems.automatic water filling machine video
BKCC01 Automatic water filling line plant/water filling production line/water filling machine
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city. Our sales people you can get video of our reference running machineIn our nearby city has a Coca cola factory, they are buy our machine, we can take you to visit.
Q2: Do you have agent and after-service stations?
A2: So far we have agent in Indonsia, Malaysia, Vietnam, South Africa, Thailand etc.. welcome to join us!
Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q5: How long time for installation?
A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Full Line Bottling Mineral Water Filling Machine Drinking Water Plant Project