Continuous Spray Water Pasteurization Tunnel


Maintenance and lubrication
Safe operation and key points
Main structure of the product
(1) Box body:The box body is mainly composed of three parts: a sterilization section, a pre-cooling section and a cooling section. The upper part of the box body is equipped with hot water, cooling water, spray pipes, etc., the middle is a conveyor chain, and the lower part has hot water, Two tanks of pre-cooling water and cooling water.
(2) Transmission system: The transmission system is composed of a can-in conveyor, a transmission chain, and a can-out conveyor. The in-can conveyor is driven by a plastic flat-top conveyor chain through a geared motor. After being fully loaded, it is squeezed into the transition plate to the transmission chain. The bottles are sterilized, pre-cooled and cooled and sent out through the can-out conveyor. Features of this machine: The inlet of the tank conveyor adopts a double-row parallel reciprocating tank feeding method, and the motors of each machine adopt stepless speed regulation motors to achieve the speed of each machine.
(3) Heating system: This machine is equipped with steam nozzles, thermocouples in the hot water tank, and steam enters the steam nozzle through the regulating valve. When the water temperature reaches the required value, the signal generated by the thermocouple of the water tank is controlled by the temperature controller to control the temperature of the hot water. The purpose of the hot water is added to the hot water spray pipe by the hot water pump to pasteurize the material.
(4) Pre-cooling system: This machine is equipped with steam nozzles, thermocouples in the pre-cooling water tank, and the steam enters the steam nozzles through the solenoid valve. When the water temperature reaches the requirements, the signal generated by the thermocouple of the water tank is controlled by the temperature controller to control the solenoid valve to control the water temperature. The purpose of pre-cooling water is added to the pre-cooling water spray pipe by the pre-cooling water pump to pre-cool the materials.
(5) Cooling system: The cooling water enters the water tank through the solenoid valve and then is added to the spray pipe through the cooling water pump to cool the material. When the water temperature in the water tank exceeds the required temperature of the cooling water, the temperature controller controls the solenoid valve to supplement the cooling water in time to make the water temperature of the cooling water tank. To meet the cooling requirements, the treated water enters the recovery tank through the water level pipe, and the water in the recovery tank can be recycled after cooling.
Technical Specification | |||
Sterilization temperature: | <95ºC (Can be adjusted) | ||
Sterilization temperature zone: | 3 Zones (Can be designed) | ||
Steam pressure: | 0.4Mpa | ||
Main Motor Power: | 1.5 KW | ||
Main Material | Stainless Steel 304 | ||
Sterilization time | 10-60mins (Can be adjusted) |
Drinking Water Treatment Equipment
It can effectively get rid of muddy organic, iron, manganese and oxide, filter suspended substance, colloid, remained oxygen of micro-organism and some of height-metal ion in the water. This water treatment equipment can also reduce hardness of water to make it all specifications of the water quality fully meet the state fresh water standards, even that of standard of mineral water,

Bottle Blowing Machine
Advantages
1.New double crank four pull-up bar clamping structure, cross balance fixed slide.
2.Sealing, stretch adapts parallel bars (CIS) design, combined, good for products molding.
3.Programmable PLC controller automatically control, microcomputer touch screen convenient operation.
4.Bottle embryo heated by infrared, controllable constant pressure control, so as to achieve the best blowing precision.

Hot Melt Glue Labeling Machine

Laser Date Printer

Automatic shrink wrap packing machine
sometimes called the winding machine and the wrapping machine.

Cap injection molding machine

Warmer Tunnel
body touch the outside air, it will has a lot small water drops outside, use this machine will warmer it to normal temperature, and after dryer machine, it will be good for packing.



Factory Design Product Design

Before Sales
2.Supply all information you required.
3.Help building reasonable factory
4.Machines video for reference.
5.Welcome to visit factory.
After Sales
2.Sending machines pictures on production .
3.Machines testing running over 8 hours, and sending testing videos.4.engineer arranged to install machines.
5.Spare Parts provided.


Beverage Mixing System

5 Gallon Water Production Line

Carbonated Juice Packing Plant

Pure Water Treatment System
2.Q:Where is your factory located? How can I visit there?
A:Our factory is located in sanxing yucai road.Jinfeng town,zhangjiagang city,jiangsu province,china. about 2 hours away from podong Airport .we will pick you up in the nearest station. All our clients, from home or abroad, are warmly welcome to visit us !
3.Q:How long is the warranty of your equipment?
A:2 years warranty after receipt check upon delivery.And we will comprehensively provide you all kinds of technical
support services in after-sale !
4.Q:What is the features of our company?
A: We provide turnkey project for customers, including pre-sale and after-sale service; complete production line equipment
supply;bottle design; layout programs provide; or provide auxiliary materials purchasing agent supplier information; equipment overseas installation and commissioning; operator training;etc
Give me the basic information about you want:
1.what kind products will you produce: water, juice, with gas or others.
2.what is your capacity you want: that how many bottles per hour you want
3.what kind of the bottle: pet bottle or glass bottle; bottle volume; bottle sharp. bestly give me the bottle picture.
4.the single machine or the whole line.
So that I can make suitable proposal for you.