Full-Span Precasting Concrete Form Post-Tension Bridge Box Girder Formwork

Price $1600.00 Compare
Min Order 150 Tons
Availability In Stock
Shipping From Hunan, China
Popularity 378 people viewed
Quantity
+-
 

Hunan Wuxin Intelligence Technology Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
  • Hunan, China
  • Paul (Mr.)  
Bridge Box Girder Formwork
Online Technical Support
1 Year
ISO, ISO 9001/ISO 14001/ISO 45001
Steel
Precast Box Girder Formwork
Blast Spray Paint
Customized
Bridge or Highway
150 Tons
Graphic Design, 3D Model Design, Other
Ton
Red/Blue/Customized
Contemporary
Days
Standard Package
Standard Package
WuXin
Standard Package
Customized
China
8474802000
Product Description
Product Description

Bridge Box Girder Steel Mold Formwork
 
ADVANCED TECHNOLOGIES
 
•Rapid removal and replacement of the formwork with various beam lengths;
•Rapid disassembly/assembly of the movable blocks of bottom formwork;
•Self-propelled running of internal formwork;
•Prefabricated box girder formwork and complete set of tooling system.

 
EXTENSIVE EXPERIENCE

•Formworks for various bridge types have been designed, such as Q2325, Q2322, Q2229 and used in plenty of projects, for instance, high-speed railways, passenger dedicated lines, highways, intercity rail transits, municipal works, cross-sea bridges, etc.

The one-step fully hydraulic automatic mold retraction of the internal mold :
No need for personnel to enter the inner cavity of the beam body during the mold retraction process, which saves time and labor, and is safe and efficient.

The main girder: 
The main beam uses upper structure, with rails, which has high rigidity, and provides enough space under botton formwork for the operator.

The "automatic longitudinal moving device of internal mold": 
Optional for automatic longitude moving device of inner formwork, which replaces the traditional method by winch, and makes the operation easier and safer.

 
Applications

 

 

 

Detailed Photos

 













 
Company Profile
 


 

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 30-45 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: No, we couldn´t offer the sample for free charge but we can invite the clients to visit our factory.

Q: What is your terms of payment ?
A: 45% payment in advance as down payment, 50% payment before shipping as balance payment, and 5% payment as garantie after installation and testing in site.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1600.00 60 Tons(MOQ)

Concrete Bridge Construction Material Prefabricated Steel Segmental Beam Girder Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.
$1600.00 60 Tons(MOQ)

Concrete Building Material Intelligent Segmental Bridge Girder Beam Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.
$1600.00 60 Tons(MOQ)

Concrete Building Bridge Construction Material Precast Steel Segmental Girder Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.
$1500.00 80 Tons(MOQ)

Cast-in-Situ Steel Forming Form Traveller Formwork for Road Bridge Concrete Construction

Hunan Wuxin Intelligence Technology Co., Ltd.
$800.00 400 Square Meters(MOQ)

Formwork Aluminium for High-Rise Building

TANGSHAN XINGHE TRADE CO., LTD.
$39.90 1 Piece(MOQ)

Heavy-Duty Aluminum Arch Roof Truss for Outdoor Events

Qingdao King Machinery Manufacturing Co., Ltd.
$0.90 10 Pieces(MOQ)

Construction Formwork System Rapid Clamp Wedge Clamp for Building

Cangzhou JDG Scaffolding Co., Ltd.
$0.90 10 Pieces(MOQ)

Formwork Clamp Rapid Clamp Tensioner for Building Construction

Cangzhou JDG Scaffolding Co., Ltd.
$0.90 100 Pieces(MOQ)

Formwork Components Rapid Tensioner Clamp Lock Spring Lock for Rebar Tensioning

Cangzhou JDG Scaffolding Co., Ltd.
$0.90 10 Pieces(MOQ)

Safety Clamp Spring Clip Clamp for Formwork

Cangzhou JDG Scaffolding Co., Ltd.