The high-end system of SE150-9 excavator is equipped with imported turbocharged engine, strong power, low fuel consumption, strong plateau adaptability, adopting international famous brand hydraulic components, excellent performance, high reliability, new load-sensitive hydraulic system, cross-stage large displacement The constant power variable pump is matched with a new generation of low-loss main valve, the whole machine has fast response speed, high efficiency, low energy consumption, smooth operation, precise and durable structural parts. The upper frame adopts modal analysis technology, which is durable and effectively reduces machine vibration , Reduce noise, fully optimize the design of structural parts, and strengthen the treatment of key stress positions, without fear of harsh working conditions.
Original imported turbocharged engine, strong power, low fuel consumption, strong plateau adaptability Using international famous brand hydraulic components, excellent performance and high reliability Brand-new load-sensitive hydraulic system, cross-stage large displacement constant power variable pump matching a new generation of low-loss main valve, the whole machine has fast response speed, high efficiency.
and reduces fuel consumption
* Convenient maintenance
Fully open engine hood, with positioning mechanism, light and safe to open, large engine compartment space, convenient for
maintenance


Total length (mm) | 7860 | Overall width (mm) | 2645 | Total height (to the top of the cab) (mm) | 2860 |
Radius of tail gyration (mm) | 2380 | Minimum ground clearance (mm) | 425 | Track length (mm) | 3645 |
Total height (to the top of boom) (mm) | 2855 | Distance from the center of rotation to the rear end (mm) | 2375 | Gauge (mm) | 2000 |
Track width (mm) | 2500 | Standard track shoe width (mm) | 500 | Width of rotating platform (mm) | 2645 |
Engine | model | Cummins QSF3.8T (National ) | Hydraulic system | Hydraulic pump form | Double axial variable piston pump |
form | Four-cylinder water cooling, high pressure common rail, turbocharged | Maximum working flow (L/min) | 130x2 | ||
Number of cylinders X cylinder diameter X stroke (mm) | / | Boom cylinder-cylinder diameter X piston rod diameter X stroke | / | ||
Displacement (L) | 3.76 | Stick cylinder-cylinder diameter X piston rod diameter X stroke | / | ||
Rated power (kw/rpm) | 86/2000 | Working circuit pressure/pressurization (Mpa) | / | ||
Bucket | Bucket capacity (m3) | 0.45~0.7 (0.65) | Selwing system | Rotation speed (r/min) | 11.3 |
Bucket width (mm) | / | Braking type | Wet double disc, swash plate plunger motor, pressure release | ||
Stick digging force/pressurization (KN) | 70 | Fuel tank capacity (L) | 245 | ||
Bucket digging force/pressurization (KN) | 105 | Cooling system (L) | 20 | ||
Engine oil quantity (L) | 12 |









(2)Spare parts: CANMAX is dedicated to provide our clients with genuine spare parts with the highest quality,exact fitness and appropriate function.with our global distributor network,you are guaranteed with fast deliveries and services, wherever you are,please submit your spare parts request to us,and list products name ,description of required parts.we guarantee that your request will be handled quickly and appropriately.
(3)Installation & Maintenance: CANMAX is able to provide with the overall installation of complicated machinery,allowing you to start the normal operation of construction machinery solutions.After installation,we will make inspection of the whole machine,operate equipment,and provide you with testing data reports of installation and operation.
(4)Training: CANMAX offer perfect facilities and comfortable environment and can provide training services to different users. The training sessions include product training, operation training, maintenance know-how, technical know-how training, standards, laws and regulations training and other training, all of which are tailored to fulfill your individual needs. Training programs can be conducted in our factory field, or at the client's site.
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q2. Which incoterms 2010 terms can we work?
A: EXW, FOB, CFR, CIF.
Q3. What about the delivery time?
A: Generally, it will take 7-15 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q4. What about the warranty time?
A:12months after shipment or 2000 working hours.
Q5. Do you test all your goods before delivery?