Product Information
Installation site | Open field Pile-Ground Mounting System |
Max wind speed | Up to 60M/S |
Snow load | 1.4KN/m2 |
Applicable Module | Framed or Frame less |
Array Layout | According to the actual situation |
Module Orientation | Landscape,Portrait |
Rail Material | Anodized aluminum |
Post Material | Hot-dip galvanized steel |
Pipe Length | 1000-2000mm |
Standard | GB50021-2001 |
GB50007-2002 | |
GB500011-2001 | |
Duration | More than 20years |
Pile driving depth | 1000-2000mm |
Warranty | 10 years warranty |
Features
1.Concise and professional design allows low usage of materials which makes it ti be the most economical pne among piling structure.
2.Wide adaptability of modules arrangement(2-row in vertical and 3-row in horizontal configuration) to fit for size of land.
3.four steps complete the installation work( 1.Piling. 2.Install folded structure. 3.Install rail. 4.Fix module)
4.10-years warranty and 20years of service life provided
Project Detail

Project Show

