Heavy-Duty Construction Pile Breaking Equipment

Price $7.20 Compare
Min Order 20 Pieces
Availability In Stock
Shipping From Fujian, China
Popularity 298 people viewed
Quantity
+-
 

Fuzhou Great-Victory Imp. & Exp. Trading Co., Ltd.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
  • Fujian, China
  • Huang (Mr.)  
    General Manager
S Type
Installation Guidance
Consumables
Pile Head Cutter
New
6month
Dry Environment
45mmw*700mml
1.50kg
WYC
Carton & Vacuum Packing
720*150*200mm
China
Product Description

PILE HEAD CUTTER("PHC")
NAMEAPPLICATIONPACKING
PHC(ES)Small cut pile headФ500mm-Ф800mm600×35mm×10pcs
PHC(S)Large cut pile headФ900mm-Ф1200mm700×45mm×10pcs
PHC(B)Large cut pile headФ1300mm or more550×70mm×10pcs
Bracket
NAMEACCESSORY
For PHC(ES)Bracket type ESBThe brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head
For PHC(S)Bracket type B
For PHC(B)Bracket type BB/DBB
De-bonding foam
NAMEREMARKS
De-bonding foam
for vertical reinforcement anchor bar
There are five sizes with a diameter of 16-40mm
 
How the PHC Works
 
1.  The bonding between concrete and steel is removed by covering all reinforcement bars with de-bonding covers.
2.  The PHC that is installed with the water in the concrete and expand. The expansion will cause stresses in the concrete that has set. The expansive stresses will exceed that of the compressive stress of the concrete after 3 to 4 days and hence causing a crack in the pile head.
3.  The cracking of the pile head at the position of the PHC will hardly propagate below the intended cracking line.
Components
 
   1.  PHC
                a) Type ES-35mmWx600mml
                b) Type S-45mmlWx700mml
                c) Type B-70mmWx550mml
  2.  Steel Reinforcement De-Bonding Covers
        Various sizes - From Φ16mm to Φ40mm
   3.  Steel Brackets
                a) Type ESB
                b) Type SB
                c) Type BB
                d) Type DBB
     4.   Plastic bag 
                a) 5C-W130mm-L1100mm
                b) 5C-W140mm-1400mm

 
Installation Procedure
   
   1.  The PHC materials are fixed to the steel Reinforcement cage prior to lowering the cage into the bored hole for concerting.
   2. 
The PHC are initially fitted to the steel brackets.
     3.  The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
   4.  Install de-bonding covers to all the steel 
Reinforcement starter bars above the PHC.
   5. 
The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
 
Pile Head Removal

   1.   After concreting, wait 4 to 5 days for crack to form at the pile head.
   2. 
When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.
 
                            CONFIGURATION OF PHC FOR EACH PILE SIZE

Q: Why choose our product?
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.

Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.

Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.

Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.

Q: How long is the shelf life of the product?
A: 
In a dry environment  6-8 month.

Q: Which country have you exported?
A: 
Most Southeast Asian countries.




























  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$7.20 20 Pieces(MOQ)

A Chemical Agent Can Crack the Pile More Efficient Break Concrete

Fuzhou Great-Victory Imp. & Exp. Trading Co., Ltd.
$8.20 20 Pieces(MOQ)

Pile Breaker for 300-2500mm Round Heavy Project Head Concrete Cutter

Fuzhou Great-Victory Imp. & Exp. Trading Co., Ltd.
$6.20 20 Pieces(MOQ)

Low-Noise, Low-Vibration and Dust-Free Pile Breaking Machine

Fuzhou Great-Victory Imp. & Exp. Trading Co., Ltd.
$8.20 200 Pieces(MOQ)

Low Noise and Low Vibration Hydraulic Concrete Breaker Equipment

Fuzhou Great-Victory Imp. & Exp. Trading Co., Ltd.
$180.00 1 Piece(MOQ)

Dozer Front and Rear Guide Idler Wheel for Caterpillar Crawler Undercarriage Track Repair

Quanzhou Keruijia Machine Co., Ltd
$1200.00 1 Piece(MOQ)

Gr-30 Hydraulic Rotor for Wood Grapple

Yucheng Runming Machinery Co., Ltd.
$7.00 100 Pieces(MOQ)

Isde Isbe Construction Diesel Engine Part 4890189 Crankshaft Position Sensor for Cummins

Sichuan Hongjun Science and Technology Co., Ltd.
Negotiable 10 Pieces(MOQ)

PRECLEANER 4M0310 FOR CATERPILLA R 3114 3116 3208 3304 4M-0310

LUOYANG RELIABLE MACHINERY PARTS CO., LTD
$4800.00 1 Piece(MOQ)

18-25 Tones Excavator Sb70 Hydraulic Rock Breaker Concrete Hammer Hydraulic Breaker for Sale

Yantai Jiwei Construction Machinery Equipment Co., Ltd.
$211.00 1 Piece(MOQ)

Csdls Construction Engineering DN160 Concrete Pump Spare Parts Delivery Conveying Cylinders

Changsha Dalishen Hydraulic Engineering Co., Ltd.