Heavy-Duty Steel Formwork for Bridge Columns

Price $1050.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Beijing, China
Popularity 452 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
  • Beijing, China
  • Tom (Mr.)  
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Heavy-Duty Steel Formwork for Bridge Columns stands out for its exceptional strength and durability, making it perfect for repeated use across various construction projects. Its ease of assembly and fixed shape make it ideally suited for projects requiring uniform structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. The total net weight of a loaded container generally ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Different products require different packaging methods:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are placed in bags and then secured on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container load, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time varies depending on the destination port.
3. Special requirements will be addressed through negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.

Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products forbridges and tunnels.

Q3: How can you assist us?
A: We provide suggestions, formwork layout drawings, and quotations for construction project stakeholders such as owners, design institutes, or contractors.
B: We sell our products to contractors, building companies, material suppliers, and trading companies.
C: We supply our exceptional formwork products to our global peers.

Q4: How long does it take to create a preliminary design and quotation after we submit the structural drawing?
A: Generally, it takes3
~7 days depending on the specific construction project requirements.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days based on the type and quantity of the products to be produced.

Q6: What are your terms of payment?
A: We require 30% T/T in advance with the balance due before shipment.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1050.00 1 Ton(MOQ)

Steel Column Formwork for Building Bridges

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Supporting Construction Frame with Low Price, Aoyu Formwork Wholesale Steel Single-Side Bracket

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Formwork Support for Concrete Single-Sided Construction

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Adjustable Construction Column Steel Formwork for Viaduct

Beijing Aoyu template Co., Ltd.
$800.00 400 Square Meters(MOQ)

Formwork Aluminium for High-Rise Building

TANGSHAN XINGHE TRADE CO., LTD.
$39.90 1 Piece(MOQ)

Heavy-Duty Aluminum Arch Roof Truss for Outdoor Events

Qingdao King Machinery Manufacturing Co., Ltd.
$0.90 10 Pieces(MOQ)

Construction Formwork System Rapid Clamp Wedge Clamp for Building

Cangzhou JDG Scaffolding Co., Ltd.
$0.90 10 Pieces(MOQ)

Formwork Clamp Rapid Clamp Tensioner for Building Construction

Cangzhou JDG Scaffolding Co., Ltd.
$0.90 100 Pieces(MOQ)

Formwork Components Rapid Tensioner Clamp Lock Spring Lock for Rebar Tensioning

Cangzhou JDG Scaffolding Co., Ltd.
$0.90 10 Pieces(MOQ)

Safety Clamp Spring Clip Clamp for Formwork

Cangzhou JDG Scaffolding Co., Ltd.