High Efficiency Membrane Water Wall Panel with Reasonable Price

Price $1500.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Shandong, China
Popularity 413 people viewed
Quantity
+-
 

Gaomi Kunbo Thermal Power Engineering Co., Ltd.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
Customization
ISO, ASME
Customized
Painted
Coal
Power station, Industrial
Boiler Parts
High Efficiency Membrane Water Wall Panel
Industry Boiler Power Plant Boiler
as Your Requirement
1 Year
HTEG
Standard Seaworthy Package
Customization
Shandong, China
8402111000
Product Description
High Efficiency Membrane Water Wall Panel with Reasonable Price
Producrt Description
High efficiency membrane water wall panel with reasonable price is main radiation heat surface, arranged inside the boiler chamber and proceeds the heat exchange directly with the high temperature flame. The convection tubes are the convection heat surface of the boiler, arranged between the boiler chamber outlet and the end heat surface and proceed the heat exchange directly with the high temperature fume. The water wall and convection tubes are the main heat surface of the boiler, the tubes diameter for both Generally used  φ51~60mm boiler steel tubes, also as the request.

High efficiency membrane water wall panels with reasonable price are membrane walls that are made of  tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Membrane water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Advantages

1). To guarantee the leakproofness of furnace walll and reduce the air leak of combustion chamber.

2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler's start and furnace shut down.

4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

5) Compared with the bare tubes, the boiler accessories membrane water wall improves the heat absorption capacity of tubes.

6) China reasonable price membrane water wall could improve the preliminary combination degree of boiler parts and reduce the installation workload.
Our Company
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.

Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
Package & Delivery
Packing Details: We have standard seaworthy package and we also could try our best to package the product to meet your requirement.

Delivery Details: We have the most reliable transportation to make sure your goods arrived your destination as soon as possible.

Consumer Visit
Every consumer has the chance to visit our workshop before placing the order. we will provide comfortable environment and completed product information for you to know our product deeply. Welcome your inquiry and sincerely hope we can cooperate with each other!

Certifications

1) Certificate of conformity of quality management system certification

2) Environmental management system certificate

3) Occupational health and safety management system certificate

4) Installation, Alteration, Repair & Maintenance License of Special Equipment People's Republic of China
FAQ
Q1: Are you trading company or manufacturer ?

A: We are factory.

Q2:When the product can be delivered?

 A: Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.

Q3:What's the advantage of your company?

A:We have exported our boilers and service to more than 50 countries./ we have specialize team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturing technology.

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1550.00 1 Ton(MOQ)

Hot End Heating Elements Corrugated Sheet Bakset for Rotary Aph

Gaomi Kunbo Thermal Power Engineering Co., Ltd.
$1540.00 1 Ton(MOQ)

Industrial Boiler Component H Finned Tube Economizer for Steam Boiler

Gaomi Kunbo Thermal Power Engineering Co., Ltd.
$1500.00 1 Ton(MOQ)

Boiler Heat Transfer Parts Enamel Tube Air Preheater

Gaomi Kunbo Thermal Power Engineering Co., Ltd.
$1550.00 1 Ton(MOQ)

China Factory Supply Heating Elements for Raph

Gaomi Kunbo Thermal Power Engineering Co., Ltd.
$2.40 100 Pieces(MOQ)

Precise High Temperature Tolerance Surface Anti-Oxidation Four Claw Grate

Shandong Jiaguang International Trade Co., Ltd.
$465.00 1 Piece(MOQ)

Original Siemens Control Box Lfl1.322 for Industrial Combustion Heating Gas Burner Controller

Shenzhen YHG Heating Science & Technology Co., ltd
$187.00 1 pieces(MOQ)

SUNSET Oil Pump Replace Suntec Oil Pump E1069 for Oil Burners

Jinzihao (Fujian) Combustion Equipments Co., Ltd.
$254.00 1 set(MOQ)

Customized Automatic Industrial Diesel Oil Burner Light Oil Burner for Bitumen Tank

ZHENGZHOU BONA HEAT ENERGY EQUIPMENT CO., LTD
$1500.00 1 Ton(MOQ)

Factory Price 0.2MPa Membrane Panel in Boiler Studded Water Wall Panel

Jiangsu Sat-cham Energy Technology Co., Ltd
$1800.00 3 Tons(MOQ)

Waste Incinerator Boiler Superheater Serpentine Coils SA192 Power Plant

Zhangjiagang Hua Dong Boiler Co., Ltd.