High Frequency Welding Studding Studded Pipes Tubings Tubes For HRSG refinery furnaces Air Cooler

Price $1.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Jiangsu, China
Popularity 449 people viewed
Quantity
+-
 

JIANGSU LIANGYI CO., LIMITED

VIP   Audited Supplier 12 years
Profile Certified by SGS/BV
Studded Tubes
Welded
ERW
Carbon Steel
Polish
Pipeline Transport
Round
Studded Tubes
carbon steel
LY
Bundle and Wooden Box Packing
CE
Jiangyin
722840000
Product Description
We are professional High Frequency Welding Studded Tubes Tubings Studding Studded Pipes for HRSG refinery,furnaces,Air Cooler,boiler,gas turbines,fired heaters,Fluidized Bed Coils from china
Production of studded tubes
The steel studs are automatically resistance welded to the tube, producing high quality forge welds. The welding process enables the combination
of any grades for studs and tube: carbon, low alloy, stainless steels and high nickel alloys. Alloy steel pipes are stress-relieved after studding, 
according to the relevant specifications for the class and grade of steel used.
Because of their relative easy of cleaning, studded tubes or nail head pipes are used in furnaces and fired heaters as an alternative to high frequency
welded finned tubes wherever the process application is such that heavy fouling of the external surface may occur.
The studs are attached to the pipe in diametrically opposing pairs around the circumference by electrical resistance welding to ensure a high
integrity bond for strength and heat flow. Stud diameter, height and pitch can be specified on an individual basis.
 
Test of studded tubes
Welding tests are carried out as a matter of course to ensure the effectiveness of the stud to pipe bond. Heat treatment of the completed studded 
tube is carried out where necessary. Should fouling eventually reduce the process performance of the equipment, the studded surface can be 
cleaned efficiently by shot blasting without damage to the materials.
An electric current is applied by connect on the stud and tube and theresistance in this circuit produces the heat necessary for welding. Maximum
resistance and therefore maximum heating occurs at the interface Between the Stud and the tube. Pressure to forge the Stud and the tube together 
at the point of maximum heating is applied by various forms of tooling. These resistance welding processes produce a strong metallurgical bond 
between the stud and the tube while minimizing the heat affected zone (HAZ) in the tube. The use of pressure to forge the fin and the tube 
together helps to minimize the heat input necessary to make the weld. This Product is used in Fired Heaters under Very High Pressure & 
Temperature mainly in Petroleum refineries. 
Studding of pipes up to 8 inch dia and stud diameter up to 18mm can be supplied in Carbon steel, alloy steel and stainless steel pipes.
 
Advantages of Steel studs :
1)Satisfying connection surface, little heat loss .
2)Welding connection rate higher than 90 percent.
3)No need of welding power, hardly any welding tumor .
4)Narrow heated zone on the surface, no melted pool, without destroying the tissue of basic tube.
5) Welding parameters are strictly  set to ensure the quality of bulk studded tube and avoid the instability of manual operation
 
For a rapid quotation requested following information,
Base tube : Diameter, thickness, length and material specification and whether ends are plain or weld prepped.
Studs : Diameter, length or height, number per circumferential row/or circumferential pitch, plus vertical pitch and material specification. 
Number of rows of studs and plain end length
 

Specification of studded Tube

Base Tube O.D
(mm)

Base Tube Thickness (mm)

Tube Height
(mm)

Tube Length (meter)

60 mm ~219 mm

4.0 mm ~20 mm

10 mm ~ 38 mm

1-25m

Base Tube MaterialA106GrB, A335 P5/P9 A204 TP304

Stud MaterialCS ANSI 410, SS304 5%Cr-1/2Mo


  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$2.00 1 Piece(MOQ)

X46Cr13(1.4034) Forged/Forging Pipes/Tubes/Hollow Bars/Sleeves

JIANGSU LIANGYI CO., LIMITED
$2.00 1 Piece(MOQ)

Inconel 783 Forged Sleeves Bushes Bushing Pipes Tubes Piping Tubing Parts (Alloy 783, UNS R30783, Inconel783)

JIANGSU LIANGYI CO., LIMITED
$2.00 1 Piece(MOQ)

X46Cr13(1.4034) Stainless Steel Forged/Forging/Rolled Rings

JIANGSU LIANGYI CO., LIMITED
$2.00 1 Piece(MOQ)

21CrMoV5-11(1.8070, 21crmov511, 21crmov5.11) Forged Forging forge steel steam turbine generator rotor shafts roller shafts

JIANGSU LIANGYI CO., LIMITED
$520.00 1 Ton(MOQ)

API 5L Psl1/2/ASTM A53/A106 Gr. B/JIS DIN/A179/A192/A333 X42/X52/X56 Carbon Seamless Steel Pipe

TIANJIN BOER KING STEEL CO., LIMITED
$1200.00 1 Ton(MOQ)

304 321 316 Precision Capillary Tube Stainless Steel Pipe

Guangzhou Kingmetal Steel Industry Co., Ltd.
$680.00 25 Tons(MOQ)

Oil and Gas Pipeline Pipe Factory Supply API 5L ASTM A106 A53 Grade B Sch40 Hot Rolled/Cold Rolled Carbon/Mild Steel Ms Iron Black Welded Seamless Tube/Pipe

Shandong Chicago Material Co., Ltd
$1.20 1 Ton(MOQ)

Precision Pipe Hydraulic Cylinder Honed Tube

Anhui Gano Hydraulic Technology Co., Ltd.
$1860.00 5 Tons(MOQ)

Hot Sale Mirror Polishing 321 310S Stainless Steel Pipe for Heat Exchanger

XINHANG SPECIAL MATERIAL CO.,LTD HANGZHOU BRANCH
$4149.00 5 Tons(MOQ)

Tp316L Stainless Steel Tubing for Glass Railing

SHS Stainless Steel Co., Limited