Plastic Injection Product Description:
Item | Plastic injection moulding parts | Plastic material | ABS,PP,Nylon,PC or any other material as you need |
Type of enterprise | Professional manufacturer of injection molds and injection molding parts | Service | OEM,Design based on your idea or Make mold and produce based on your drawing |
Design software | Solidworks, Pro-E, UG, CAD, Rhino etc. | Drawing format | Step, Igs, PDF, CAD etc. |
Produce Size | From small to big, based on your drawing or sample | Product weight | 1g-10kgs |
MOQ | 100PCS | Production ability | 10,000pcs/day |
Assembly & Test | Professional assembly factory with 6 assembly lines | Package | Standard carton, pallet or customized package |
Payment details | T/T, L/C, D/A, D/P, Western Union, MoneyGram, Veem, Paypal etc | Delivery time | For mold & samples: 3-4 weeks. For mass production: 15 workdays |
Shipping way | By Courier DHL, Fedex, TNT, UPS, EMS, By Sea or By Air | Prototype | 3D printing, CNC, Laser cutting etc |




Excited and ready to help support your project from the early stages of part development and tool design to fabrication and parts production via professional engineering, manufacturing, and project management, we are confident that our service level is second to none.
When you choose CEMAL- whether it's for a single part, a small run or a multi-year contract - you'll get the same attention to detail, the same problem-solving approach, the same quality solution. That's the CEMAL promise.
Making our customers satisfying, Keeping our customer successful is the goal of CEMAL.


Why Choose CEMAL
1. Are you a trading company or a manufacturer?
We are a manufacturer as you can see our workshop as above.
2. What kind of trade terms can you do?
EX-WORKS,FOB,CIF,DDP DDU
3. What is your terms of payment?
50% Mold cost deposit,balance mold cost +50% production cost paid when samples confimed,Balance production cost paid against copy
of B/L. We accept T/T
4. Do you support OEM ?
Yes, we can produce by technical drawings or samples.
5. How about your delivery time?
Generally, it take 20-30 working days ( 15-25 days do mold and 5-10 days do mass production).