I. Introduction II. Main Technical Data
| No. | Component | Qty |
| 1 | Double station (glass fiber cloth/mesh cloth) discharge rack (manual correction, 20kg magnetic powder brake) | 2Sets |
| 2 | Single station (aluminum foil/fiberglass felt) discharge rack (manual correction, 20kg lightweight magnetic powder brake) | 1Set |
| 3 | Coating gluing system (see Note 2) | 2Sets |
| 4 | Aluminum foil (mesh cloth) heating roller ( Φ150×1700mm, temperature 200ºC) | 1Pc |
| 5 | Bridge roller Mirror roller (Φ120×1750mm) | 1Pc |
| 6 | Silicone roller (Φ250×1754mm, temperature 350ºC, liquid silicone imported from South Korea) | 1Pc |
| 7 | Cooling steel roll (Φ175×1750mm, with water-cooled jacket, pneumatic clutch) | 1Pc |
| 8 | Heat transfer oil heating roller 1 (Φ270×1780mm) | 1Pc |
| 9 | Heat transfer oil heating roller 2 (Φ400×1780mm, shaft seat with water-cooled jacket, NSK high temperature bearing) | 1Pc |
| 10 | Heat transfer oil heating roller 3 (Φ500×1780mm) | 1Pc |
| 11 | Conductive copper ring with carbon brush (80A/80A/30A) | Each 1 Set |
| 12 | Glass fiber distribution flattening tension control system (Φ160×1780mm rubber roller, Taiwan Research new magnetic powder clutch manual controller) | 2Sets |
| 13 | Aluminum foil (glass fiber felt) flattening tension control system (magnetic powder clutch supporting domestic manual controller) | 2Sets |
| 14 | Aluminum alloy guide roller (Φ120×1700mm) | 8Pcs |
| 15 | Steel guide roller (Φ120×1700mm) | 8Pcs |
| 16 | Main heating roller drive system (4kw motor with frequency converter and reducer) | 1Set |
| 17 | Glass fiber cloth dewaxing hot roller drive system (2.2kw variable frequency motor supporting frequency converter and reducer) | 1Set |
| 18 | Auxiliary heating roller drive system (3kw variable frequency motor supporting frequency converter and reducer) | 1Set |
| 19 | Double station receiving rack (manual correction, 4kw vector variable frequency motor supporting frequency converter) | 2Sets |
| 20 | Compound hydraulic mechanism (Suzhou Xuzhan Φ63×80mm) | 1Set |
| 21 | Coiling and pressing device | 2Sets |
| 22 | Fiberglass cloth inflatable discharge shaft (3 inches) | 2Pcs |
| 23 | Aluminum foil inflatable discharge shaft (3 ") | 1Pc |
| 24 | Inflatable receiving shaft (3 inches) | 2Pcs |
| 25 | Heating roller Heating tube (1800w/ Pc) | 45Pcs |
| 26 | Punching clutch cylinder (distance, Φ50×150mm) | 2Pcs |
| 27 | Tension Controller (Jiangsu) | 2Sets |
| 28 | Man-machine interface (10 inch, MCGS) | 1Set |
| 29 | PLC Module (Mitsubishi) | Whole Sets |
| 30 | On-line trimming system (HongHua) | 1Set |
| 31 | Exhaust hood (retractable, HongHua) | 1Set |
1. Equipment design speed 35 m/min; normal production 8~25 m/min;
2. Aluminum foil unwinding air expansion shaft adopts enhanced type.
Note 2: Coating and gluing system
A. Technical parameters
1. Maximum coating and gluing material width: 1600mm;
2. Maximum mechanical speed: 35m/min;
3. Coating roller (anilox roller) diameter: 40 mesh, φ120mm~φ300mm;
4. Coating roller (anilox roller) circumference: 377mm~942mm;
5. Scraper string movement: ±5mm (independent motor drive).
B. Structure
1. The main wall panels are processed by imported large-scale machining centers, and small parts are processed by imported small-scale machining centers to ensure high precision and high stability;
2. The roller and roller shaft are integrated and can be quickly replaced;
3. Heavy-duty scraper structure, double cylinder pressurization, lifting, front and back, and swing angle are freely adjustable;
4. The scraper is driven by an independent motor;
5. The scraper moves back and forth, and frequency conversion control is adopted;
6. Stainless steel rubber disc, self-reflow open, up and down lifting can be adjusted manually;
7. The aluminum roller and the roller shaft are assembled by heat sleeve;
C. Specifications
1. Drive motor: AC4kw AC vector frequency conversion motor (SIEMENS Beide motor);
2. Frequency converter: 4KW (Gitaike);
3. Scraper pressure: 5~60kg;
4. Scraper movement: ±5mm.
III. Delivery period
The supplier shall deliver the machine within 60 days after receiving the deposit drawing confirmation (holidays are postponed).
IV. Main color of the equipment appearance
The main color of the equipment appearance is white/mechanical gray.