Suitable for hydrostatic pressure test of steel pipes with outer diameter of 25mm~168mm, also can be customized.
Process flow: Material storage rack → the step-by-step pipe moving device moves four steel pipes to the material waiting rack → the horizontal feeding conveying device rises and horizontally moves the steel pipe to be pressure tested to the pressure testing station of the hydraulic press → clamps → the pressure test heads at both ends move forward → pipe end seals → water injection and exhaust → exhaust valve closes → water injection valve closes → pressurization → pressure maintenance → pressure relief → pressure test heads at both ends move back → release the clamps → steel pipes are sent out → next cycle.
| No. | Equipment name | Quantity (sets) |
| 1 | Hydraulic tester mainframe | 1 |
| 2 | Clamping device | 3 |
| 3 | Stepper tube transfer device | 1 |
| 4 | Lifting and translation pipe feeding device | 1 |
| 5 | Lifting and translation pipe outlet device | 1 |
| 6 | Qualified and unqualified product baskets | 1+1 |
| 7 | Pneumatic system | 1 |
| 8 | Hydraulic system | 1 |
| 9 | Water system | 1 |
| 10 | Electronic control system | 1 |







1 how long have you been in this filed?
we have been in this filed for more than 15 years.
2 Do you have any Certification with product or your factory?
yes, we have passed TUV certification with our product and factory.
3 where is your factory?
we are in shandong province,it is about 150KM far from Qingdao port.
4 Can we be as your agent in our country?
yes, if you have this idea, welcome to visit our factory and talk about this, or we fly to visit you.








Audited Supplier









