
VDE 3188 Standard RoHS Compliance 250C 300/500V fluoroplastic PTFE wire cable
Charcteristic:
High temperature resistance,low temperature resistance anti-acid,anti-oil,antisepsis and moisture,DIN VDE 0250,ROHS compliance.
Application:
Apply to household appliance,illumination & lighting & Headlamp,electric machines,temperature sensor,Military series,Metallurgy Chemical series,Motor cars & Ships Electrical Installation.
/Conductor | /Insulation | Electrical Characteristic | /packing | ||||
AWG | Conductor construction NO×♀mm | Diameter mm | Insulation Thickness mm | Over Diameter mm | Realst.max Cuc.c 20ºC ohm/km | Permissiblle ampacity 20ºC-AMR | / mt/coils |
26 | 7×0.16 | 0.49 | 0.30 | 1.09 | 143.00 | 3.15 | 610 |
24 | 7×0.20 | 0.61 | 0.30 | 1.21 | 89.30 | 5.04 | 305 |
22 | 19×0.15 | 0.76 | 0.30 | 1.36 | 56.40 | 7.98 | 305 |
20 | 19×0.185 | 0.93 | 0.30 | 1.53 | 35.20 | 12.78 | 305 |
18 | 19×0.235 | 1.16 | 0.30 | 1.76 | 22.20 | 20.27 | 305 |






Our products can meet UL, VDE, CCC, PSE ,CE certificate requirement and the products are accord with ROHS and REACH Halogen free standard.
Our factory could meet ISO9001:2008 management systems standard. There are 10 production lines in high quality, precise, automation which supporting daily capacity 300,000km cables at least.

1. Professional QC and QA team to make sure all products qualified before shipping.
2. Competitive price
3 .Standard package to ensure the safe transportation.
4. Professional service
1. Production
Qualified production, competitive price, professional service.2. Technology
Professional R& D team
3. Equipment
With completive testing equipment.
4. Quality
UL/ CE/ FCC/ RoHS/ Reach certificate
Q1: Can I get a free sample?
A1: We can provide the existing items samples free in freight collected. If there is any special samples requirement, please contact us for more details.
A2: We prefer T/T or L/C at sight. If you prefer other payment terms, please contact us freely.
A3: We have the standard export package. For more details about the customized package, please contact us.
A4: It depends on the order quantities. The mass production lead time is about 7-12 days after receipt of the deposit.
A5: We are a factory. We provide all kinds of OEM/ODM services for clients around the world.
A6: We export to the North America, Southeast Asia, Europe, Korea, Japan, and other countries.