Infitek CFG-15D 15000RPM High Speed micro Centrifuge- Patent multi-flow air cooling design to provide air exchange to prevent chamber warming.
- Three-layer seal ensures air-tightness and biosafety.
- High strength aluminum alloy rotor can be fully autoclaved for unlimited service life.
- Four rotors are optional complete with 24 places 1.5/2.0ml tubes, bigger 5.0ml, smaller 0.2ml and 0.5ml tubes with adapters.
| Specifications | CFG-15D |
| Max. Speed | 15000rpm(200-15000rpm), increment: 10rpm |
| Max. RCF | 21380×g, increment: 10×g |
| Speed Accuracy | ±20 rpm |
| Rotor Capacity | 5ml×18, 5mL culture tube×12 0.2ml/0.5ml/1.5ml/ 2ml×24, 0.5ml×36, PCR8×4 |
| Run Time | 30sec-99min/Continuous |
| Acceleration/Braking time (Sec) | 25s↑25s↓ |
| Motor | Brushless DC motor |
| Safety Devices | Dual door interlock, over-speed detection, automatic internal diagnosis |
| Power | Single-phase, AC200V-400V, 50Hz/60Hz, 5A, AC100V-120V, 50Hz/60Hz, 8A 200W |
| Noise Level | <=64dB |
| Dimension (W×D×H) | 280mm×364mm×266mm |
| Weight | 12 kg |
| Other functions | Speed/RCF switch; Short-time run function; sound-alert function |





Q: How about quality of the goods?
A:
- All the running products comply with CE standards.
- Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
- Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
- Timely reply to pre-sales enquiries
- Real-time update of manufacturing and shipment status
- Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.





Audited Supplier










