Lianggong Formwork Manufacture Steel Manhole Trench Shields Aluminum Trench Shoring Box for Excavation Construction

Price $1288.00 Compare
Min Order 25 Pieces
Availability In Stock
Shipping From Jiangsu, China
Popularity 460 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
Manhole Trench Shoring Boxes System
One-Stop Service
1 Year
ISO, CE
Aluminum
Trench Box and Manhole Box
Manhole Box Trench Shoring Trench Shield
Aluminum Trench Shields
China Manhole Trench Shoring Box for Excavation
Lianggong Formwork
Pipeline and Deep Excavation Construction
Modern
Painted, Powder Coating
Blue, Red, or Customized
300 Tons/Month
Graphic Design, 3D Model Design, Total Solution Fo
Online Technical Support, Onsite Installation
Quick Assemble
LIANGGONG
Standard Package
Customized
China
848060
Product Description
China Lianggong Formwork Manufacture Steel Manhole Trench Shields Aluminum Trench Shoring Box for Excavation Construction

Product Description

Trench Shoring System Trench Box Trench Shields

Trench shoring system ( steel and aluminum trench box, trench shoring, trench shields, trench sheets, manhole box, manhole boxes, ), is a safety-guard system most commonly used in the excavation of ditches and pipe laying etc. Due to its robustness and handiness, this steel-made trench boxes system has found its market throughout the world. Lianggong, as one of the leading formwork & scaffolding manufacturers in China, is the only factory who is capable of producing trench boxes system. Trench boxes system has loads of advantages, one of which is that it can be leaning as a whole because of mushroom spring in the spindle which greatly benefits the constructor. Besides, Lianggong offers an easy-to-operate trench lining system which immensely improves the working efficiency. What's more, the dimensions of our trench boxes system can be customized according to the customers' requirements such as the working width, length and the maximum depth of the trench. Furthermore, our engineers will give their suggestions after considering all the factors so as to provide the optimal choice for our customer.
 

Characteristics

1Easy to assembly on site, installation and removal are significantly reduced.
2Box panels and struts are built with simple connections.
3Repeatedly turnover is available.
4This enables easy adjustment for strut and box panel to achieve the required trench widths and depths.
 

Product Show

 

Packaging & Shipping

 
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.


Delivery:
1Production: For full container, normally we need 20-30 days after receive customer's down payment.
2Transportation: It depends on the destination charge port.
3Negotiation is needed for special requirements.
 
 

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

Any question, please feel free to contact Lydia Zou!
 

Recommended by seller

 
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$90.00 300 Square Meters(MOQ)

China Factory H20 Timber Beam Table Formwork for Slab Construction Concrete Pouring

YANCHENG LIANGGONG FORMWORK CO., LTD.
$120.00 20 Pieces(MOQ)

Lianggong Manufacturer High Quality Aluminum Frame Formwork for Wall and Column Construction

YANCHENG LIANGGONG FORMWORK CO., LTD.
$69.00 300 Pieces(MOQ)

Lianggong Manufacturer Adjustable Efficient Concrete Modular Steel Frame Formwork for Wall/Column/Slab Construction

YANCHENG LIANGGONG FORMWORK CO., LTD.
$1399.00 10 Tons(MOQ)

China High-Quality Concrete Metal Steel Tunnel Formwork for Building Construction

YANCHENG LIANGGONG FORMWORK CO., LTD.
$0.90 10 Pieces(MOQ)

High Quality Safety Clamp Spring Clip Clamp for Formwork

Cangzhou JDG Scaffolding Co., Ltd.
$256.00 100 Square Meters(MOQ)

New Design Steel Frame Formwork Gk90 for Wall and Column

Beijing Zulin Formwork & Scaffolding Co., Ltd
$1600.00 60 Tons(MOQ)

Hydraulic Segmental Beam Formwork for Customized Concrete Building Applications

Hunan Wuxin Intelligence Technology Co., Ltd.
$10.00 1 Piece(MOQ)

Trio Wall Formwork Bulkhead Tie Rod

RIZHAO JINHUA FORMWORK CO., LTD
$1600.00 60 Tons(MOQ)

Precast Segmental Girder Formwork Bridge Steel Beam Mold for Construction

Hunan Wuxin Intelligence Technology Co., Ltd.
$90.00 300 Square Meters(MOQ)

Scaffolding Prop Supporting Concrete Formwork System Slab Construction Shuttering Table Formwork with H20 Timber Beam for Floor

YANCHENG LIANGGONG FORMWORK CO., LTD.