
Raw material:LDPE, GMS, TAC, Talc, Butane or LPG
Finished products:PE Foam Net
Screw material:38CrMoALA
Barrel outside diameter: φ140mm
Extruder capacity:Approx 15-40kgs/hr
The range of foam net diameter: 20mm-150mm
Production line speed:10-60m/min
Installed power: Installation power:43kw Electric consumption:11kw/h
Manufacturer:Longkou Fuchang Packing Machinery Co.,Ltd
Address:Youth-tech Pioneer Park,Langao,Longkou,Shandong Province,China










EPE Foam Fruit Net Making Machinery | ||
Model: | FCEPEW-75A | FCEPEW-75B |
L/D | 55:1 | 55:1 |
Speed of screw: | 5-50r/min | 5-50r/min |
Power of Main Motor: | 11kW | 15kW |
Foaming Ratio: | 10-40 | 10-40 |
Specification(String)of | 10-42 | 10-42 |
Capacity: | 700-1000KGS/24Hr | 1000-1200KGS/24Hr |
Cooking Method: | Air-cooled,Water-cooled | |
Installation Power: | 43KW | 47KW |
Dimension: | 13000*1300*1800mm | 15000*1300*1800mm |
Weight: | 3000Kgs | 3200Kgs |

•Feeding capacity:50kg/time
•Material:FCD25 forgeable lion
•Gear wheel:SCM4 special gear wheel
•Material:FCD25 (able to forge steel)


•Diameter:∮75 (L/D-55:1)
•Material: 38CrMoAl
•1-4Unit is Heating Unit
•5-6Unit is Free cooling unit
•7-10Unit is Water cooling Unit


•Material:Carbon Alloy Steel
•Heating method:Electricity heater
•Power of motor:4kw
•Bypass converting screen changer, material pressure is filter equally when screen is changed, no stop, no sheet broken, no wasted material.


•Foaming agent:Butane gas in liquid state
•Pump:high pressure metering pump
•Output pressure highest:Max 38MPa
•Output regulation:Regulate the itinerary of piston
•Pressure panel:0-38MPa
•Pump:high pressure measure pump
•The range of measure:35-245CC/min
•Volume of melting-pot:5-7L


•Haul off motor Power:0.75KW
•Cutting motor power:0.75KW



1.The warranty period: 1 year Guarantee for the maintance and repairment of the forming machine exclude the parts of quick-wear. The spare parts will be provided according to the client requirement.
2.The pre-production:we offer custom-made service to our customers, you need to provide us some samples,such as photos,dimensions etc.
3.The installing issue: fuchang will send engineers to customers' place . The customer should help installation, the engineer is responsible for installation, testing and training for 30 days.
4.The price:We are a manufacturer and we can provide the considerate price and make sure the quality .