2) Clean room turnkey service scope: including design, manufacturing, construction, commission, training and after-sale service;
3) Clean room cosntruction standard(GMP): Class 100-100000; ISO 5-8; Class B-D
4) Customization of clean room: Costomer only need to prepare the land, steel structure, water/ electricity supply, etc
5) Leadtime of clean room project from design to construction:
Design: about 20-30 days;
Manufacture: about 1 month;
Construction: 3-6 months according to site condtions and area.


Flush type light fixture
Extrude light fixture
White-enamelled steel
Stainless steel light
Clean room telephone
Cleanroom project Accessory Equipments:Static pass through box
Dynamic pass through box
Air shower
Sampling and weighing booth
Laminar air flow/FFU
Gowning lockers and benches
Wash sink
Hand disinfector and dryer