

Main Steel Structures | Galvanised steel frame system | ||||
Shell (aluminium alloy aluminium veneer) | |||||
Surface treatment of the shell (metal fluorocarbon paint baking paint) | |||||
Thermal insulation and waterproofing (polyurethane insulation) | |||||
Glass wall (6+12A+6 insulating Lowe toughened glass) | |||||
Skylight(6+1.52+6 laminated toughened glass) | |||||
Window (6+1.52+6 laminated toughened glass) | |||||
Entry door (standard customised door) | |||||
Entry Lock (Hotel Outdoor Waterproof Intelligent Door Lock) | |||||
Electrical equipment (air conditioner/water heater) | |||||
Equipment door (aluminium custom door) | |||||
Exterior & top Light Strips (Surround Ambient Light Strip) | |||||
Interior Decoration | Ceiling (High-grade environmentally friendly fibreboard hardcover) | ||||
Walls (high-grade environmentally friendly carbon crystal panels) | |||||
Flooring (high-grade environmentally friendly plastic wood panels) | |||||
Interior Surround Ambient Lighting Strip | |||||
Customized wall panels | |||||
Spot lights & Electric Curtain Tracks & curtains |



2) Offer exclude furnitures & entry platform & floor heating system & water supply and drainage & projector;
3) Current and voltage can bee converted if needs;
4) Clinet need to finish concreted pillars & electrical power & pipes advance on-site.

1)L8.5*W3.3*H3.2m, around 28sqm, power consumption around 10kW, living capacity 2-4 person, gross weight around 5 tons;
2) Offer exclude furnitures & entry platform & floor heating system & water supply and drainage & projector;
3) Current and voltage can bee converted if needs;
4) Clinet need to finish concreted pillars & electrical power & pipes advance on-site.



1)L11.5*W3.3*H3.2m, around 38sqm, power consumption around 12kW, living capacity 4-6 person, gross weight around 10 tons;
2) Offer exclude furnitures & entry platform & floor heating system & water supply and drainage & projector;
3) Current and voltage can bee converted if needs;
4) Clinet need to finish concreted pillars & electrical power & pipes advance on-site.

1)L5.8*W3.2*H3.2m, around 18sqm, power consumption around 8kW, living capacity 2 person, gross weight around 4 tons;
2) Offer exclude furnitures & entry platform & floor heating system & water supply and drainage & projector;
3) Current and voltage can bee converted if needs;
4) Clinet need to finish concreted pillars & electrical power & pipes advance on-site.





