Oxygen Powder Spraying System for Quantum Electric Arc Furnace

Price $20000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Jiangsu, China
Popularity 350 people viewed
Quantity
+-
 

Yangzhou Baorui Automation Technology Co., Ltd.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
  • Jiangsu, China
  • wangping (Mr.)  
    Minister
DN15~DN300
Guided Installation
2 Months
Customized
New
Gas
Semi-Automatic
Auxiliary Equipment
ISO
baorui
Wooden Box
DN15~DN300
China
8514901000
Product Description

Oxygen powder spraying system for quantum electric arc furnace
Furnace wall oxygen gun:
       Furnace wall oxygen gun, furnace wall carbon gun
Stovetop oxygen gun:
       Oxygen gun lifting system, stove roof carbon oxygen gun

(EAF Quantum)
The basic principle of quantum electric arc furnaces
The preheating shaft of the Quantum electric arc furnace is carried out by means of a scrap hoist mounted on the roof of the furnace to lift the tilting chute, which is automatically filled by the rectangular scrap basket that has been installed in advance in the scrap yard, and the scrap charging operation is fully automated. The preheated scrap is added to the molten pool in batches, and the scrap is melted by the input electricity and the oxygen blown in by 2 top guns. The furnace shell itself can tilt steel or slag driven by 4 hydraulic cylinders, while the lid and shaft furnace are fixed.
The slagging material can be added through the furnace cover, and the alloy material is added to the ladle when the steel is discharged.

1.1 Scrap trough lift
A scrap trough lift similar to a blast furnace charging lift
1.2 Finger scrap holding system
The fingers are completely withdrawn from the shaft furnace when loading. The surface of the finger is protected by a special steel plate that can withstand the mechanical impact caused by the charge.
1.3 FAST steel outlet system
Slag-free steel system, the outlet filling operation can be carried out during the energization period, and the steel outlet can also be carried out during the energization. Therefore, the preparation time per furnace (de-energization time for steel output, loading, filling of the steel outlet, etc.) of the burner in the slag-free steel zone is only about 4 minutes.
1.4 Furnace shell action
Move the furnace shell for steel extraction and slag picking.
The electrode lifting system and carbon oxygen gun are installed on a fixed bench, and can be tilted at the same time as the furnace shell, which can quickly replace the furnace shell, reduce the action of the furnace body, and reduce the difficulty of system maintenance operation.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$25000.00 1 Piece(MOQ)

50t Electric Arc Furnace Furnace Wall Oxygen Gun Water Cooling Protection Box

Yangzhou Baorui Automation Technology Co., Ltd.
$20000.00 1 Piece(MOQ)

Eaf Metallurgical Toner System Spare Parts-Eaf Hose

Yangzhou Baorui Automation Technology Co., Ltd.
$200000.00 1 Piece(MOQ)

110t VOD Furnace Oxygen Gun System

Yangzhou Baorui Automation Technology Co., Ltd.
$20000.00 1 Piece(MOQ)

The Electric Arc Furnace Door Oxygen Gun Grabs The Head-108~203

Yangzhou Baorui Automation Technology Co., Ltd.
$1000000.00 1 Piece(MOQ)

Rolling Mill/Roughing Mill/Prefinishing Mill/Finishing Mill for Rebar/Stee Coils

Jiangyin Starshine Machinery Technology Co., Ltd.
$47900.00 1 Piece(MOQ)

20mt 25mt 30tons Ceramic Powder Compaction Press with Die Sets

Wuxi Geepro Machinery Import&Export Co., Ltd.
$20000.00 1 Set(MOQ)

5t 30t Iron Steel Copper Aluminum Scrap Metal Smelting Equipment Intermediate Frequency Induction Melting Furnace

Xi'an Sanrui Electric Furnace Co., Ltd
$50000.00 1 Piece(MOQ)

Stationary Type with Diagonal Door Melting Furnace

Wuxi Aluwell Imp & Exp Co., Ltd.
$65.00 1 Piece(MOQ)

Tungsten Carbide Mill Roll (TC roll)

Camet Metallurgical Technologies Co., Ltd.
$1500.00 2 Pieces(MOQ)

110X110X900mm R6000 Copper Mould Tube for CCM

Seawoo Haishun Industries Co., Limited