High Speed Double Station
200ml - 2L Blow Molding Machine
- Fast speed of clamping from differential designed hydraulic system
- Perfect usage for LARGE AMOUNT production of 200ml - 2L bottle, toy, container, kettle, etc.
- Optional extruder for multi-layers and transparent stripe.
- Imported key components, save future A/S charges and free troubles.
Basic Equipment
| Clamping system | Double Station+High-precision guide+large arm cylinder axle |
| Extrusion System | Hard gear surface decelerator+Japan inverter |
| Die system | Center -incoming extrusion die with special steel |
| Hydraulic system | Japan hydraulic valve seal and proportional control |
| Control system | Japan PLC+Imported+PLC automatic temperature control model+Imported electrionic parts |
Configuration List:
| PLC | MITSUBISHI | Japan |
| Touch Screen | HITECH | Taiwan |
| Inverter | MITSUBISHI | Japan |
| Power Supply | MEAN WELL | Taiwan |
| Relay | OMRON | Japan |
| Hydraulic Valves | YUKEN | Japan |
| Hydraulic Pump | YUKEN | Japan |
| Contactors | LS(LG) | Korea |
| Solid relay | FOTEK | Japan |
| Breaker | LS(LG) | Korea |
| Temperature Control Module | MITSUBISHI | Japan |
| Oil Sealing | DZ | Taiwan |
| Oil Tube | LIEBAO | Taiwan |
| Transducer | GEFRAN | Italy |
| Proximity Switch | SONON | China |
| Motor | SIEMENS | China |
Parameters
| Specifications | ||
| Material | PE,PP, PVC, PA... | |
| Max container capacity | L | 2 |
| Number of die | Set | 1, 2, 3, 4 |
| Output(dry cycle) | Pc/hr | 1000x2 |
| Machine Dimension(LxWxH) | M | 3.1x2.1x2.4 |
| Total weight | T | 4.2 |
| Clamping Unit | ||
| Clamping force | KN | 46 |
| Platen opening stroke | mm | 130-370 |
| Platen size | mm | 300x380 |
| Max mould size(WxH) | mm | 300x350 |
| Mould thickness | mm | 135-210 |
| Power | ||
| Max drive | KW | 20.5 |
| Total power | KW | 26 |
| Fan power for screw | KW | 0.25 |
| Air pressure | MPA | 0.6 |
| Air consumption | M3/min | 0.4 |
| Average energy consumption | KW | 15 |
| Extruder unit | ||
| Screw diameter | mm | 55 |
| Screw L/D ratio | L/D | 24 |
| Melting capacity | Kg/hr | 50 |
| Number of heating zone | zone | 3 |
| Extruder heating power | KW | 11.6 |
| Extruder driving power | KW | 15 |
| Die | ||
| Number of heating zone | zone | 2 |
| Power of die heating | KW | 4.2 |
| Max die-pin diameter | mm | 75 |
| Center distance of double die | mm | 130 |
| Center distance of tri-die | mm | 110 |
| Center distance of tetra-die | mm | 75 |
Delivery Time:
- No later than 30 days after receipt of the deposit
Training:
- We provide training service for two or three operating men for free (but the cost for trainer's board and lodging is not included).
Installation:
- The supplier will send one specialist to test run the machine until it is running in normal state.
Guarantee:
- Our guarantee is valid for a period of 12 months. If the malfunction caused of the machine's self quality, we will troubleshoot it for free.
Auxiliary Equipments:
- Auxiliary equipments for production line are available and optional, please kindly ask for quotation.








Audited Supplier