PP Construction Hollow Plastic Formork

Price $40.00 Compare
Min Order 200 Pieces
Availability In Stock
Shipping From Guangdong, China
Popularity 497 people viewed
Quantity
+-
 

Zhanjiang Kingstar Building Material Co., Ltd.

VIP   Audited Supplier 20 years
Profile Certified by SGS/BV
  • Guangdong, China
  • Kingstar chen (Mr.)  
    Manager
KSP-001
10
10
ROHS
Plastic
Wall Formwork
Glossy
12mm, 14mm, 15mm, 18mm etc
30-50times
Construction, Shuttering Board
Yes
Yes
Wooden Pallet
1220*2440mm, 915*1830mm or customized
China
39219090
Product Description
PP Hollow Construction Sheet also called Polypropylene Plastic Construction Formwork, which is lightweight, high strength and can be reused at least 40-50 times, is a good replacement for Plywood formwork.





Specifications:
Size1220*2440mm, 915*1830mm or customized
Thickness14mm, 15mm, 16mm, 18mm
Colorgrey surface + black core, white surface + white core

Character:
•Simple and efficient, speedy assembly
•Lightweight and good hardness and toughness
•Anti-worm, waterproof, anti-corrosion

•Easy to cut, nail and screw on it
•Cost saving, can be reused 50 times
•Smooth off shutter finish
•No plastering
•No beam filling

•Easy to carry and can relieve workers from heavy labor


Applications:






Installation and Usage Instructions
1. The top plate of the plastic building template is used to lay 15mm thick. The vertical die of the shear wall can be 15mm based on the thickness and height of the wall.
2, the distance between the woods:
(1) roof plastic formwork support: Woods spacing is determined according to the thickness of floor concrete. In general construction conditions, the woods spacing (center distance) is less than 0.15m thickness, which is 200mm to 250mm.
(2) Supporting shear wall plastic templates: Woods spacing is adjusted by the all wall's height and thickness. For example, the wall height is 2800mm and the wall thickness is 300mm, when the 15mm thickness template is used, the vertical sub rib spacing is 150mm, and the shear wall and pillar width is more than 1 meters, the fixed frame must be added.
3. There is no gap between the shear wall and the column mould, and the part of the Yin angle (the bottom of the wall) must have a wooden side, which is convenient for the connection of the beam, the wall and the formwork. The shear wall formwork must be assembled into a whole after lifting, and then place a flat board , so to reduce labor intensity, and a good forming.
4. The edge of the plastic template is 15 ~ 30mm from the edge of the template. The strength of the nail is moderate and the length of the nail is generally 40 ~ 50mm, so it should not be too long or too short.
5, the wooden side of the floor of the beam must be left out of 1.5 centimeters, and the wall is standing on the mouth of the wooden square, so that it will not leak out the pulp and save the wall material.





  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1.20 300 kg(MOQ)

PVC Foam Board for Kitchen Bathroom Cabinet Door Wardrobe Furniture

Zhanjiang Kingstar Building Material Co., Ltd.
$180.00 300 Pieces(MOQ)

Size 1220*2440mm Thinckness 3mm-22mm PVC Wood Plastic Co-Extrusion Sheet

Zhanjiang Kingstar Building Material Co., Ltd.
$1.20 5000 kg(MOQ)

WPC Foam Board Wood Plastic Composite Sheet Kitchen Bathroom Cabinet Door Skin Wardrobe Sink Board

Zhanjiang Kingstar Building Material Co., Ltd.
$1.80 5000 Square Meters(MOQ)

High Glossy PVC Ceiling Panel for Interior Decoration

Zhanjiang Kingstar Building Material Co., Ltd.
$40.00 200 Pieces(MOQ)

PP Construction Hollow Plastic Formork

Zhanjiang Kingstar Building Material Co., Ltd.
$15.00 2000 Pieces(MOQ)

Mideast Painted Formwork Steel Prop for Building Construction

TIANJIN FRIEND STEEL TUBE CO., LTD.
$130.00 1000 Square Meters(MOQ)

Aluminum Formwork System Recyclable Engineering Material for Construction Concrete

CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
$7.00 1000 Pieces(MOQ)

Light and Easy to Install Building Construction Structural Concrete Insulated Thin-Walled Square or Rectangular Box Plastic Concrete Columns Slab Formwork

Suzhou Topo New Material Co., Ltd.
$8.80 500 Pieces(MOQ)

Fence Panel Clamp Base Plate Fromwork System

Shandong Pinzheng Metal Products Co., Ltd.
$6.00 2000 Meters(MOQ)

H20 Wood Beam /Timber Beam for Formwork Construction Accessories

Beijing Zulin Formwork & Scaffolding Co., Ltd