PPR Pipe Clamp with Size 20mm-63mm

Price Negotiable Compare
Min Order 1000 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 397 people viewed
Quantity
+-
 

FAME TOP INDUSTRIAL LIMITED

VIP   Audited Supplier 11 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • David (Mr.)  
    Sales Director
FT10105
Welding
Vertical
Rigid
PP-R
Standard
Green,White,Grey
Fametop
Carton
20mm-160mm
China
39174000
Product Description
PPR Pipe Clamp With Size 20mm-63mm
Material: 100% Fresh Hyosung R200p;

Standard: DIN8077/8078;
Available Size:20mm,25mm,32mm,40mm,50mm;63mm;

Colors: Green / Gray / White / OEM

For more than 30 years, Polypropylene Random Copolymer (PP-R) has been applied successfully
for hot and cold water applications in countries worldwide. The combination of properties such
as resistance to internal pressure, flexibility and impact have made PP-R the material of choice for
a safe and reliable long-lasting installations. No wonder that PP-R has been continuously replacing
traditional materials like copper and galvanized steel over the last decades.


Benefits of PP-R:
• Service life according to tests performed under ISO 15874
• No contact corrosion when exposed to iron particles
• Taste and odor neutral
• Bacteriologically neutral
• Fast and easy installation
• Entire plastic systems available
• Good chemical resistance
• Low tendency to incrustation

Fusion Instructions:
1,Mark the pipe

Mark the pipe for depth of penetration into the heater bush and fitting (see table). The mark must remain visible under heating and joining. 
2,Heat pipe and fitting

Push the pipe and the fitting into the heating tools. Once pipe and fitting are hot (after the correct time), pull out pipe and fitting very slowly.
3,Joint pipe and fitting

Joint the pipe & the fitting and push the pipe until it reaches the mark (that has to stay outside).
During the jointing time the welded part of pipe and fitting must remain fix, without any rotation.
During the cooling time, the welded part of pipe and fitting can be adjusted until cold. 
4,Fusion inspectoin

Fusion inspection. The outer fusion seam must be inspected. The seam must be present all around the pipe.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$0.30 5000 Meters(MOQ)

Pex-Al-Pex Pipe with Insulation for Hot Water

FAME TOP INDUSTRIAL LIMITED
$4.50 1000 Pieces(MOQ)

Brass Water Distribution Manifold with or Without Inserts

FAME TOP INDUSTRIAL LIMITED
Negotiable 1000 Pieces(MOQ)

PPR Pipe Clamp with Size 20mm-63mm

FAME TOP INDUSTRIAL LIMITED
$0.30 5000 Meters(MOQ)

Overlap/Butt-Welded Pert-Al-Pert Pipe for Hot Water and Heating Under En ISO21003 Standard

FAME TOP INDUSTRIAL LIMITED
$0.01 500 Pieces(MOQ)

UL Listed Steel EMT Coupling

Hangzhou EVT Electrical Co., Ltd.
$3.00 10 Pieces(MOQ)

Straub Open Flex Clamp Full Open Pipe Coupling Large Diameter Pipe Repair Fittings

Weihai Haoyu Metal Products Co., Ltd
$14.87 1000 Pieces(MOQ)

HDPE Fittings Reduce Coupling for PE Pipe Fittings

Zhejiang Longye Pipe Industry Co, . Ltd.
Negotiable 500 Pieces(MOQ)

German Quality PPR Double Union Ball Valve for Hot Water and Heating

FAME TOP INDUSTRIAL LIMITED
$6.87 50 Pieces(MOQ)

304 Stainless Steel Pipe Cap, BSPT Threaded Fitting

WENZHOU JIANHAO PIPE FITTING CO., LTD.
$5.00 1 Piece(MOQ)

Dalian Beston High-Quality Carbon Steel Riser Clamp UL Series Pipe Hanger Bolt Riser Clamp Manufacture Sample Available Black or Galvanized Two Bolt Pipe Clamp

Dalian BestOn Industries Co., Ltd.