Compulsory devices |
1 | Spring feeding machine | 1 set |
2 | Conical twin screw extruder SJ-65/132,80/156 | 1 set |
3 | Pipe die head | 16-400mm |
4 | Vacuum calibrating tank | 1 set or several sets |
5 | Water spraying cooling tank | 1 set or several sets |
6 | 2-3-4-6-8-10-12 caterpillars hauling off machine | 1 set |
7 | Saw cutting machine or planetary cutting machine | 1 set |
8 | Pipe stacker-6000mm length | 1 set |
9 | Electrical cabinet(ABB,Omron,RKC,Schneider etc) | 1 set |
10 | Spare parts | 1 set |
Optional Devices |
1 | High speed hot and cold mixer | 1 set |
2 | Plastic crusher | 1 set |
3 | Plastic pulverizer | 1 set |
4 | Industrial water chiller | 1 set |
5 | Air compressor | 1 set |
6 | Thermocontroller for die head | 1 set |
7 | Ink jet printer | 1 set |
Payment, delivery and after sales services |
1 | Payment terms | 40% for prepayment by T/T, 60% for balanced payment by T/T, or L/C can be acceptable |
2 | Delivery time | 60 days after receipt of prepayment |
3 | Packing method | Wooden cases/pallets with stretching films |
4 | Guaranteed time | 18 months for mechanical parts, 12 months for electrical parts |
5 | After sale service | Send 1-2 engineers to customers' factory to help them install, test the machine, and train their workers. This is chargeable |
| | |