


1. Experienced QC testers to check the products dimension, surface and performance according to drawings specification.
2. Experienced IQC to check the dimensions and surface of the incoming material.
3. Experienced PQC to inspect full-course during the processing.
4. Experienced FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments.
Quality sample will be provided for your testing before production according to ISO 9001: 2008.
We are pleased to service you with excellent quality, reasonable cost and grow withyou together.
Product range | Producr design,mold design, mold making and produce plastic parts |
Processing Craft | Mold fabrication, Injection etc; |
Material | ABS, PC, PP, , POM(Acetal/Delrin), Nylon 6, Nylon 6/6, PA 12, HDPE, LDPE, PS(HIPS), PMMA(Acrylic), SAN/AS, ASA, PVC, UPVC,TPE, TPR, PU, TPU, PET, PEI(Ultem), PSU, PPSU, PPE/PS, PTFE, GPPS, PPS, PPO, PES, CA, etc. |
Surface finish | Polishing finish,Texture Finish,Glossy Finish,Electroplating,Painting,Slik print,Rubber Painting etc |
Color | RAL/PANTONE color |
Mold Standard | DME,LKM,FUTA,HASCO etc. |
Mold Material | S136H, 718H, NAK80, P20, H13, etc. |
Tolerance | 0.01~0.1mm |
Mold Life-cycle | 100,000-500,000 shots. |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Quality Control | Conducted by ISO9001 System and PPAP Quality control documents |
Inspection | IQC, IPQC,FQC,QA |
Application | All kinds of plastic injection parts being used in a variety of industrial application |











strong professional engineering and designing team,come to us,you will be in good hands.
You:This is my first time to create a new product,i have no idea what should i do to make it happen.






A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air
Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.