Poor Boy Degasser for Oilfield Equipment Vertical Mud Gas Liquid Sludge Centrifuge Separator

Price $31000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Shaanxi, China
Popularity 356 people viewed
Quantity
+-
 

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
  • Shaanxi, China
  • Oliver (Mr.)  
    Sales Manger
ZCNQF-800/1.5
24/7
1 Year
ISO 9001:2000, ISO 9001:2008
Electric
Alloy
Liquid Gas Separator
180-320
0.8-2.5
800-1200
125-200
zhongcheng
Pallet or Wooden Case
China
Product Description
Degassor for Oilfield Equipment  Vertical Mud Gas  liquid sludge  Centrifuge  Separator


Product Description

 
Mud/Gas Separator is a piece of special equipment for degassing gas-invaded mud in the first grade. It is mainly used to remove big bubbles above φ3mm in diameter and these bubbles refer to expanded gases in the fluids that fill in some parts of well annulus. Well kick even spilling out to the rotary table will easily occur if they are not removed.

Spec
 
ModelZCNQF-800/1.5ZCNQF-1000/2.5ZCNQF-1200/2.5
Capacity180m3/h240m3/h320m3/h
Main body Diameter800mm1000mm1200mm
Working pressure: Mpa0.8/1.51.5/2.52.5
Main body Diameter800mm1000mm1200mm
Inlet Pipe :mmDN100DN125DN150
Output Pipe:mmDN125DN200DN250
Gas Discharge pipeDN125DN200DN200
Weight:KG180022002500
Dimensions1800x1800x53502000x2000x58602200x2200x6634

Detailed Pic
 




 
Why choose us ? 

Q1. Are you a manufacturer?

Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided . 

Q2. Do your equipment come with a warranty?

Yes, we have one year warranty. and we provide very patient after service job .

Q3. Can we customize the equipment from you?

Yes,  actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.

Q4. How do you deliver your equipment?

By sea usually 

Q5. What's the lead time for the equipment and its spare parts?  

Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.




If you interested , Welcome to inquire us . Looking Forward with your cooperation  .





  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$5000.00 1 Piece(MOQ)

Manufaturing Oilfield Solid Control Equipment Drilling Mud Fluid Cyclone Separator Cleaner Desander

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$8000.00 1 Piece(MOQ)

Professional Manufacturers Water Supplying Circulation Storage Tanker

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$25000.00 1 Piece(MOQ)

Petroleum/Oilfield Drilling Fluids Horizontal Explosion-Proof Oilfield Drilling Decanter Centrifuge

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$5000.00 1 Piece(MOQ)

Oilfield Solid Control Drilling Fluid Mud Tank Stirrer Propeller Mixer Agitator

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$49999.00 1 Piece(MOQ)

High-Efficiency Decanter Centrifuge for Industrial Applications Advanced

Xi'an Hondin Energy Technology Co., Ltd.
$5999.00 1 Piece(MOQ)

China Manufacturer Centrifugal Pump for Industrial Pumping Applications

KES Separation Machinery Tianjin Co. Ltd
$450.00 1 Piece(MOQ)

Factory Supply Desander Desilter Hydrocyclone for Drilling Fluids Separation

Xi'an Boban Oil Tools Co., Ltd.
$5000.00 1 Piece(MOQ)

Oilfield Drilling Fluids Solid Separator Cleaner Control Equipment Mud Desilter

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$50.00 10 Pieces(MOQ)

Factory Price Unb/Rgf/3nb Triplex Drilling Rig Mud Pump Spare Parts

Dongying Sanhao International Trade Co., Ltd
$4500.00 1 Piece(MOQ)

Hongdin Energy Technology Centrifugal Pump

Xi'an Hondin Energy Technology Co., Ltd.