Powder Coating Line with Shotblasting Equipment

Price $110000.00 Compare
Min Order 1 Set
Availability In Stock
Shipping From Hebei, China
Popularity 447 people viewed
Quantity
+-
 

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
ZYA01
Lifetime
2 Years Warranty
Coating Production Line
Powder Coating
Aluminum
CE, ISO
New
Gas/Electricity/Diesel/LPG
Automatic
ZHYAO
Metal Frame with Plastic Film
Customized
China
8424300000
Product Description

Product Description

 
No.Process NameProcess ParameterModeRemarks
TemperatureTime
1LoadingRT  Manual 
2Pretreatment 8 -10minutes Automatic
 
 
3Drying Oven 100-120ºC10-20 minutesAdjustable
4Cooling  5-10 minutes 
5Powder coatingRT1.5m/min 
6Curing180-220ºC15-20 minutesAdjustable
7CoolingRT10-15 minutes 
8UnloadingRT Manual 
Pretreatment system PP material: High corrosion resistence and light weight
PP powder booth:Duarable and easy to clean
Cyclone separator powder recycle system: Quick color change, shorten down time. Powder recovery rate>95%
Drying & Curing oven:
  • Uniform Heat Distribution: Curing ovens provide a consistent and controlled environment, ensuring even heat distribution across the product. This uniformity is critical for achieving consistent quality in the cured products.
  • Temperature Control: They allow precise temperature control, which is essential for materials that require specific curing conditions to achieve optimal properties.

Detailed Photos

 

Packaging & Shipping

 

Company Profile

FAQ

Partening for sucess: The overview of cooperate with ZHYAO

1.To determine the optimal technical solution with Zhyao
We employ a streamlined approach. We request customers to complete a Customer Needs Research Questionnaire. This enables us to swiftly comprehend their requirements and deliver tailored, cost-effective technical solutions. Upon agreement, we proceed to finalize the chosen solution and sign a contract, ensuring clarity and alignment between all parties involved.
 
2. Zhyao production process control and information synchronization 

Establish a project team with the customer (members include customer leaders, customer engineers, our project managers, our engineers, and our construction personnel, and provide each stage of the project schedule, videos, pictures and text to report the project progress to the customer.)

3.Packaging and transportation

Category packaging, labeling, and use of cargo packing lists will ensure that no goods are missed. Make packing plans in advance based on volume and weight before transportation to maximize container utilization and make the weight ratio reasonable, thereby reducing freight and improving safety. Cargo After arriving at the site, classify and place them according to the cargo list to facilitate later installation.

4.Installation
The installation process is controlled to ensure high-quality and efficient installation. 1. Preparation before installation and full communication with customers. 2. Initial stacking of goods according to the location of the spraying line upon arrival. 3. Effective communication during the installation process and reasonable matching (installation sequence Arrangements should be made as synchronized as possible depending on the customer's personnel situation and equipment installation sequence.

5. Verification
The verification part is divided into small test (partial installation can be trial run), initial test (empty test, without product), and final test (test run with product) to quickly enter production status.
During the verification process, 1-2 customer employees can be trained.

6.After sales service
Keep customer files permanently, and track product operation every month during the first year of installation. (Monthly communication helps customers better understand and use the equipment, and discover and solve potential problems.)
In the second year, we will visit customers periodically to learn about their use of equipment and track maintenance, and provide customers with help in advance for their consumable materials (reminding them of maintenance and replacement).
After three years, we will maintain communication at any time to assist customers in solving equipment upgrade and other needs.

 


  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$19000.00 1 Set(MOQ)

Horizontal Power and Free Overhead Conveyor I-Shaped Track Conveyor System

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.
$90000.00 1 Set(MOQ)

Aluminum Metal Electrostatic Powder Coating Solutions Plant From Manufacturer

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.
$80000.00 1 Set(MOQ)

Metal and Aluminum Product Industrial Automatic Powder Coating Line Paint System with Oven

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.
$130000.00 1 Set(MOQ)

Vertical/Horizontal Auotmated Powder Coating Line for Pipes/Metal Boards/Posts

Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.
$300000.00 1 Set(MOQ)

PVD Gold Ion Plating Vacuum Deposition Coating Machine

Guangdong Huicheng Vacuum Technology Co., Ltd.
$300000.00 1 Set(MOQ)

Hcvac New Furniture Table Chair Black Gold Chrome PVD Vacuum Plasma Coating

Guangdong Huicheng Vacuum Technology Co., Ltd.
$50000.00 1 Set(MOQ)

Hcvac Plastic Car Parts Chrome Aluminum Vacuum Coating Machine

Guangdong Huicheng Vacuum Technology Co., Ltd.
$300000.00 1 Set(MOQ)

Hcvac New Watchband PVD Coating Machine /PVD Vacuum Plating Equipment for Watchband

Guangdong Huicheng Vacuum Technology Co., Ltd.
$1200.00 1 Piece(MOQ)

Manual Powder Coating Gun with Advanced Electrostatic Coating Technology

Dezhou Aohai Coating Equipment Co., Ltd.
$185000.00 1 Set(MOQ)

Super Hard Film PVD Vacuum Coating Machine for Cutting Tools

Dongguan Jinyuyang International Co., Ltd