Rock Gold Ore Extraction Plant with Cyanide Leaching Process

Price $50000.00 Compare
Min Order 1 set
Availability In Stock
Shipping From Henan, China
Popularity 497 people viewed
Quantity
+-
 

Zhengzhou Hengxing Heavy Equipment Co., Ltd.

VIP   Audited Supplier 17 years
Profile Certified by SGS/BV
50-500t/h
Gold Ore Cyanide Leaching Process
Engineer Guide
Supply
380V
HengXing
Standard Container, Small Parts by Wooden Box
50-500t/h
China
Product Description
Rock Gold Ore Extraction Plant With Cyanide Leaching Process

In This , we use processing 500 t of gold ore for one day as example:
 
first Ores by the vibrating feeder get into the jaw crusher PE 400 * 600, after the primary crushing, ore get into the jaw crusher PEX250 * 1000 to the second crushing, PEX250 * 1000 and vibrating screen at the same time form a closed circuit system,
ores bigger than 20mm back to the crusher ,less than 20 mm ores by electromagnetic vibrating feeder enter into the ball mill, and also the ball mill and classifier 1500 * 9000 form a closed circuit system, solution then get into the hydrocyclones, bigger than 200 mesh particles into the second ball mill 1830 * 5500 regrinding.less than 200 mesh particles into the thickener,

 
After dealing with by the thickener, solution density reached 35-50%, then go into the leaching reaction tank , the first leaching tank to join the cyanide and need to control the PH 10-10.5,
on the last leaching tank to detection cyanide concentration detection, cyanide concentration of 0.03% to 0.06%, this line the leaching time is 24 hours at the same time adding activated carbon In the eighth leaching tank to adsorption, activated carbon flow movement to the fourth leaching tank, after activated carbon adsorption saturation, using carbon pump get out the activated carbon
 
Then use the electrowinning machine to process the loaded carbon, After that smelt to get the 99.99% gold. in this way the activated carbon can be recycled gold recovery rate can reach 97%.
tailings use filter pressure processing, water and sodium can be recycled, reduce the pollution and reduce the wastage of water


Contact:
Ms Sara Pang
Mobile phone: 0086137 8347 1727
 
 
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$2500.00 1 set(MOQ)

Industrial Coal Briquetting Equipment for Coal Dust, Coal Fines

Zhengzhou Hengxing Heavy Equipment Co., Ltd.
$7800.00 1 set(MOQ)

Spiral Classifier for Ore Beneficiation (FG15)

Zhengzhou Hengxing Heavy Equipment Co., Ltd.
$50000.00 1 set(MOQ)

Rock Gold Ore Extraction Plant with Cyanide Leaching Process

Zhengzhou Hengxing Heavy Equipment Co., Ltd.
$5000.00 1 Set(MOQ)

Mining Fine Sand Impact Crusher Price

Zhengzhou Hengxing Heavy Equipment Co., Ltd.
$75000.00 1 Piece(MOQ)

China 6ton Underground Dump Truck for Underground Metallic Mining

Yantai Chihong Machinery Co., Ltd.
$380000.00 1 set(MOQ)

Gold Loaded Carbon Elution Plant

Yantai Huize Mining Engineering Co., Ltd.
Negotiable 5 Pieces(MOQ)

2024 MTB215 MTB255 MTB285 Rock Breaker Chisel, Drilling Rod, Breaker Hammer Tool

Handan Zhongye Machinery Manufacture Co., Ltd.
$1.50 1 Piece(MOQ)

Spt Sampler with Plastic Sand Catcher

Forsun Ultra-hard Material Industry Co., Ltd.
$140000.00 1 Piece(MOQ)

High Quality Fuk-10 Underground Dump Trucks

Jinan Focor Machinery Co., Ltd.
$1.00 1 Piece(MOQ)

Durable Lanhi Shotcrete Truck for Fast and Reliable Mixing

Sichuan Lanhai Intelligent Equipment Manufacturing Co., Ltd.