Scaffolding Base Jack with Adjusting Handle for Height Leveling

Price $5.00 Compare
Min Order 500 Pieces
Availability In Stock
Shipping From Hebei, China
Popularity 412 people viewed
Quantity
+-
 

HORIZON FORMWORK CO., LTD.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
Scaffolding screw jack
Steel
Fixed
Tower Scaffolding
Frame Combined Scaffolding
Floor Type Scaffolding
Full Scaffolding
External Scaffolding
Attached Lifting Scaffolding
Scaffolding Props
Building Scaffold
Galvanized, Painted, HDG
HORIZON
Pallet
solid & hollow
China
73084000
Product Description
Scaffolding screw jack with adjusting handle for height leveling

Manufactured from both solid bar and tube, in mild steel and hi-tensile steel, Jack base & U-head are widely used in various scaffolding systems for adjusting working height.

Galvanized or Hot-dip galvanized finishing. Customized size is available as per request.

Base Jack 48mm x 800mm x 5mm

For bearing timber beams or steel beams. Slope of up to 6 % can be compensated by the head plate.

With height adjustment of 300 mm.

Scaffold Base Jack:

Screw /Tube size (mm)Base plate (mm)Nut (kg)Weight(kg)
Ø30(solid) x 400 (600)120 x 120 x 50.252.75 (3.72)
Ø32(solid) x 400 (600)120 x 120 x 50.303.10 (4.20)
Ø34(solid) x 400 (600)120 x 120 x 50.403.50 (4.76)
Ø34(hollow) x 4 x 400 (600)150 x 150 x 60.552.80 (3.39)
Ø38(hollow) x 4 x 400 (600)150 x 150 x 60.502.90 (3.60)
Ø48(hollow) x 4 (5) x 600150 x 150 x 81.005.00 (5.60)
Ø48(hollow) x 4 (5) x 820150 x 150 x 81.006.00 (6.80)

U-head Jack:

Screw / Tube size (mm)Base plate (mm)Nut (kg)Weight (kg)
Ø30(solid) x 400 (600)150 x 120 x 50 x 50.253.36 (4.33)
Ø32(solid) x 400 (600)150 x 120 x 50 x 50.303.70 (4.81)
Ø34(solid) x 400 (600)150 x 120 x 50 x 50.404.10 (5.37)
Ø34(hollow) x 4 x 400 (600)150 x 120 x 50 x 60.552.91 (3.74)
Ø38(hollow) x 4 x 400 (600)150 x 150 x 50 x 60.503.61 (4.28)
Ø48(hollow) x 4 (5) x 600180 x 150 x 50 x 81.006.24 (6.82)
Ø48(hollow) x 4 (5) x 820180 x 150 x 50 x 81.007.20 (8.00)
Customized size are available, length, diameter, thickness, as well as thread.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner!
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
Negotiable 50 Sets(MOQ)

Single-Side Formwork for Retaining Wall

HORIZON FORMWORK CO., LTD.
$20.00 1000 Pieces(MOQ)

Adjustable Steel Props to Support Slab Formwork

HORIZON FORMWORK CO., LTD.
$70.00 300 Square Meters(MOQ)

Cost-Effective Slab Table Formwork for Building Construction

HORIZON FORMWORK CO., LTD.
Negotiable 500 Pieces(MOQ)

4-Way Head H20 for Holding Beams in Slab Formwork Construction

HORIZON FORMWORK CO., LTD.
$13.87 100 Pieces(MOQ)

Steel Building Material Type Walk Thru Frame Scaffolding for Construction

RAPID Scaffolding (Engineering) Co., Ltd.
$10.00 200 Pieces(MOQ)

Building Tools Steel Props Hardware Adjustable Echaffaudage Formwork Telescopic Acrow Props Shoring Push Pull Prop Puntales Telescopicos Scaffolding Jack

Sichuan Taishenglan Technology Co., Ltd
$8.90 1000 Pieces(MOQ)

Construction Building Metal Scaffold Q235 Q355 48.3mm En39 BS1139 Black Pre-Galvanized Hot Dipped Galvanized Round Steel Gi Pipe Price

Bythai Scaffolding Co.,Ltd.
$7.90 100 Pieces(MOQ)

Painted Construction Culvert for Precast Concrete Flat Steel Formwork

Tianjin Bridge Steel Co., Ltd.
$10.00 1 Piece(MOQ)

Construction Mobile Scaffolding with Guardrail or Without Guardrail

RIZHAO JINHUA FORMWORK CO., LTD
$1300.00 1 Ton(MOQ)

SGS/TUV Certified System Scaffold, Scaffold Round Ringlock Rossete Flange, Allround Scaffold, Certified Galvanized Steel Layher Ringlock Scaffold for Sale

Wuxi Metec Metal Co., Ltd.