Our packing machine are suitable for loading powdery materials in food, medicine, daily necessities and other industries. Such as milk powder, pepper, glucose, protein powder, cocoa powder, coffee powder, rice powder, solid drinks and other powdery and ultra-fine powder bottled bag materials.
The settings vary according to the thickness of the material, the speed of conveying the product, the size of the air volume, and the temperature. If the product is not resistant to high temperatures, a low temperature can be used, and a thin shrink film can be used. If the shrink film is thick, the temperature needs to be increased, and the power of the shrink machine also needs to be selected to be larger.
The temperature increases as the speed of conveying the product increases, and vice versa. The temperature decreases as the air volume increases, and vice versa. The power of POF and PVC shrink machines is generally 5-20KW, and the temperature is generally set at around 140-°160°, and the adjustment is basically the same as that of PE shrink machines.
Power Supply | 380V ,50-60Hz |
Power | 9 KW |
Conveyor speed | 0-15 m/min |
Applicable shrink film | POF/PVC |
Whole Machine Weight | 120 KG |
Machine size (length*width*height) | 1200 *400 *200mm |
Power 9KW
Shrinkage oven size 1200 x400 x200mm
Conveyor speed 0-15m/min
Conveyor load 20kg max
Machine size 1600x560x660mm
Machine weight 80kg
Applicable shrink film POF.PVC







FAQ
A: Yes, we are directly machinery manufacturer located in Guangzhou, China. and offer Engineers oversea service .
2. Q: If I want to buy a machine, what information do I need to tell you?
What kind product are you want to use in the machine
b. What kinds of function and speed are need
c. Producing capacity requirement? How many bottles per hour
3. Q: How about the guarantee period?
A: 12 months whole machine guarantee.
4. Q: Do you support OEM/ODM?
A: Yes, we can accept OEM/ODM. Totally customized as your need.
5. Q: How to visit your factory ?
A: Our factory located at Guangzhou half hour from Canton Fair.
6. Q: Do you have certificates?
A: yes, CE, GMP quality, and have own the patent etc.
7. Q: What are the payment term?
A: T/T, Cash, Western Union is accepted. For regular order, 40% payment deposit, 60% balance before shipment.
8. Q: What's the lead time ?
A: Usually our delivery time is around 30 to 45 days.
9. Q: Deliver goods by air or by ship ?
A: Both are okay, you would choose your agent or we would arrange for you. Also offer DHL, FEDEX, TNT, PS cooperate.