Introduction
This machine is used for preshrinking and ironed tubular fabric, and equipped with magnetic separating shuttle, hydraulic lifting platform, 18mm NOMEX carpet. The fabric could keep in a stable size during this process after drying machine. Less than 5% shrinkage and excellent softness could be reached.
Based on different sources, we could offer the following four models:
Steam/Electricity+Conducting Oil (Internal loop)/ Electricity+Conducting Oil(External Circulation) / Conducting Oil Supply
The temperature of steam drying model could reach 130°C, other models' temperature are more than 180°C.
Our machine blanket is 18mm thickness, containing NOMEX material, which could resist high temperature and not pollute the fabric.
*The width of fabric: 1500 mm Max.
**Standard diameter of Cylinder is 450mm.
Design Drawing

Basic Info
| Model | FSYS450 |
| Name | Tubular Fabric Sanforizer |
| Application | Textile-finishing(shrinkage rate:2-5%) |
| Suitable Fabric | Tubular knitted Fabric Pure cotton,wool,blended fabric(cotton content>65%) |
Techical Dates
| Main Matching Fabric | tubular fabric of above 65% cotton content |
| heat source | natural gas / circulating conduct oil / steam |
| pre-shrinking type | 20mm Nomex compacting |
| supporting plate type | maglev separeted shuttle |
| fabric outfeed type | auto precisely plaiter |
| Max working width of supporting plate | 1450mm |
| Max working width of felt | 1500mm |
| working speed | 5-30m/min |
| drum temperature control type | up & down separatly control |
| drum drive type | up & down separatly drive |
| Max temperature of drum | electricity,conduct oil <190ºC,steam<140ºC |
| breadth adjustment type | manual and electromotion |
| capacity of machine | 10kw |
| standard machine power supply | 380V/3P/50HZ |
| control power supply | 220V/24V |
| steam specification of steam box | 3-6Kg/cm² saturated steam |
| steam comsuption of steam box | 50~100 kg/h |
| compressed air | 0.35-0.6MPa |
| dimension | L*W*H=6500mm*2740*2250mm |
| total weight | 4.55T |



Payment Terms:
Payment Conditions: 30% down payment by T/T and the balance payment should be TT or in irrevocable L/C at sight.
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.
Any questions and requirments,contact us now!