Solar Mains Dual Power Source Automatic Transfer Switch ATS Auto Changeover Switch

Price $15.00 Compare
Min Order 2 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 400 people viewed
Quantity
+-
 

Zhejiang Leidun Electric Co., Ltd

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
LDQ5-63
Customized, Leidun
Electric/Handle
CCC, CE, ISO9001
Integrated automatic transfer switch
2p, 3p, 4p
Automatic Transfer Switch
Ldq5-63
customizable
Packing
China
Product Description

DIN Rail Dual Power Automatic Transfer Switch (ATS) is a device that can automatically switches power in a power grid system. it is primarily used to switch to backup power when the normal power fails, ensuring continuous operation ofequipment.This product is widely used in situations where power outages are not allowed and can be operated electrically or manually.

It is suitable for AC 50 or 60Hz rated voltage 400V distribution or generator networks. The ATS has a solid structure, easy installation and maintenance, with a long lifespan and fast switching speed. It also offers safety and reliable conversion,overload protection. and energysaving features. It is specially designed for DIN rail installation and is compatible with PZ30 distribution boxes.

It consists of a TSEand controller, and can be installed verfically in a control cabinet or distribution cabinet.





Q1. Can I get samples?
Yes. If you have any needs, please contact us and we will respond within 24 hours. 

Q2. Can I use other logos or designs on the products?
Yes, we provide OEM/ODM services, you can customize products with other logos and designs.

Q3. Do you have factories?
Yes, we have factories in Jiangsu and Zhejiang, welcome to visit our company.

Q4. How do you ensure quality?
We have a complete quality management system, use qualified raw materials, conduct quality inspections in different production links, regularly collect user feedback, and trace the source in time when quality problems occur, and keep records to prevent repeated errors.

Q5. How long does it take to prepare after placing an order?
Usually it takes 5~7 days, it also depends on the quantity of the order.
 
 
 
 
 
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
Negotiable 2 Pieces(MOQ)

PV DC Circuit Breaker 3p 550V 750V MCB 1A-63A for Solar Panels

Zhejiang Leidun Electric Co., Ltd
$1.80 100 Pieces(MOQ)

1p/2p/3p/4p DC MCB Solar Miniature Circuit Breaker 20A/32A/40A/63A Mini Electrical Breakers Photovoltaic/PV

Zhejiang Leidun Electric Co., Ltd
$15.00 1 Piece(MOQ)

0.5kv 0.2kv Split Core Cast Type Straight-Through Current Transformer CT OEM ODM

Zhejiang Leidun Electric Co., Ltd
Negotiable 2 Pieces(MOQ)

Acb 1140V 2000A 3p/4p Fixed Withdrawable High Voltage Air Circuit Breaker

Zhejiang Leidun Electric Co., Ltd
$50.00 1 Piece(MOQ)

Askq1-63A 2poles Micro Transfer Switch with CE/ISO9001 Certification

Jiangsu Aisikai Electric Co., Ltd.
$350.00 20 Pieces(MOQ)

Factory Supply Diesel Generator ATS Mts 250A 3p 4p Automatic Transfer Switch

Jiangsu Aisikai Electric Co., Ltd.
$23.50 1 Piece(MOQ)

ATS 63A Three Waypowerswitch220vovervoltage and Overcurrent Protector Five Displays ATS

Zhejiang Yangcheng Electric Co., Ltd
$1800.00 1 Piece(MOQ)

Gdq5 Automatic Transfer Switch Changeover Switch 100A to 3200A ATS Manufacturer Factory Direct Sales

Guangzhou Golden Electric Co., Ltd
$300.00 1 Piece(MOQ)

PC Class 4poles 1250A Generator Electric Switch ATS

Jiangsu Aisikai Electric Co., Ltd.
$110.00 10 Pieces(MOQ)

3p 200A Automatic Transfer Switch Three Phase Generator ATS

Jiangsu Aisikai Electric Co., Ltd.