Product Description
(1) Design requirements:
1. Project Name: Bean Powder Processing Production Line
2. Capacity design: 1T/hour, with a daily working time of 24 hours.
3. Factory requirements: Area ≥ 1500 m2 (excluding warehouse), pre-treatment height ≥ 4m, powder spraying tower height ≥ 6m
Note: Due to the designed production capacity of 24T/day for this line and the large matching of equipment specifications and models, the overall height requirement for the factory building is relatively high.
NO. | Equipment's Name | Specification | POWER (KW) |
I. | |||
1 | Soybean Lifting Machine | 600kg/h | |
2 | Soybean Drying Machine | 350kg/h | |
3 | Soybean Peeling Machine | 400kg/h | |
4 | Fixed Quantity Conveyer | 260kg/h | 1.5 |
5 | Soybean Cleaning Ferment Set | 2000L/h | 2.25 |
6 | Primary Grinding Machine | 11 | |
7 | Fine Separating Set | 2000L/h | 34.75 |
8 | (,) Mixing Ingredients Tank with mixing and Warming | 2000L | 2.2 |
9 | Operating Platform | SUS304 | |
10 | Mixing Machine | 2T/h,25mpa | 18.5 |
11 | Super-High Temperature Sterilizing and Cleaning Raw Smell Set | 2000L | 7.35 |
12 | () Balance Tank with Heating | 1000L | |
13 | Electric Controlling System for Making Soybean Powder | ||
II. | |||
14 | Double Effect Concentrating Evaporator | 2400kg/h | 26 |
15 | () Balance Tank with Heating | 1000L | 4 |
16 | High Pressure Pump | 1.5T/h25mpa | 7.5 |
17 | Atomizing and Drying Tower | 500kg/h | 143 |
18 | Drying and Cooling Tank | 11 | |
19 | Hang Sieving Powder Machine | 200kg/h | 0.75 |
20 | Cooling Powder Handcart | 250L | |
21 | |||
21 | ( 3T/h24m4 , 3T/h36m1 ,5T/h36m1 ) Pump of Conveying Milk | 12 | |
22 | CIP CIP Cleaning System | ||
23 | 5T | ||
24 | ,, Pipes, Accessories and Valves for raw Material | ||
25 | Electrical material |