Steel Column Slab Wall Formwork for Concrete Construction

Price Negotiable Compare
Min Order 200 Square Meters
Availability In Stock
Shipping From Shandong, China
Popularity 541 people viewed
Quantity
+-
 

Shandong Shlomi Machinery Co., Ltd.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
  • Shandong, China
  • Aggie (Ms.)  
    Business Manager
SLM-F
Steel
Column Formwork
Red or Customized
Above 60kn/Sqm
Above 200 Times
Around 90kg/Sqm
Customized
SHLM
Standard Export Package
Customized
China
73084000
Product Description


PRODUCT DESCRIPTION

Fromwrok system

Steel Formwork is the most conventional formwork of different kinds of steel material, it is not only used in metros, bridge piers, tunnels, but also other irregular shape of concrete structures.

Feature

* Customized panel size and shapes are available;
* Ready to use pre-assembly;
* Can be cast into any size and shape according to different project structure;
* Well compatible with other formwork components.

Application

Irregular bridge piers, shaft core walls, residencial & commercial buildings, basement, bridge piers, columns ect..


Technical Specification

* Width: 0.3m/0.45m/0.6m/0.9m/1.2m/1.5m/1.8m/2.1m;
* Height:2.7m/3.0m;
* Or any customizes unit sizes according to structural drawings

 
 
 

PACKING&DELIVERY

1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

 

 

Shandong Shlomi Machinery Co., Ltd. is a professional supplier since year 2008 which produce the steel fromwork wall formworkslab formworkcolumn formwork, climbing formwork, slip formwork ,Scaffolding Accessories, Formwork accessories,Shoring Prop and so on ,We have a strong and highly efficient R&D team which can design and make OEM/ODM products according to your ideas and samples or drawings.
We insist on the "superior Quality, Competitive Price" to reach win-win situation with our customers. our main customers come from Europe, the Middle East, Australia, America and the South Africa..                                 

Important Instructions:

• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer's design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Why us: 
With 12 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 
Shandong Shlomi Machinery Co., Ltd. welcome friends all over the world !



  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$2.00 2000 Pieces(MOQ)

Formwork Scaffold Water Stop Water Stopper Nut Water Barrier Water Stoper with 65mm Flange with Plastic Sleeve Cap

Shandong Shlomi Machinery Co., Ltd.
$30.00 1000 Pieces(MOQ)

En1065 Building Galvanizd Scaffold Heavy Duty Telescopic Formwork Construction Scaffolding Support/Shoring Adjustable Steel Prop

Shandong Shlomi Machinery Co., Ltd.
$15.00 1000 Pieces(MOQ)

Casted/Forged/Pressed Formwork Clamps for Construction Steel Formwork Accessories

Shandong Shlomi Machinery Co., Ltd.
$2.00 1000 Pieces(MOQ)

BS1139 Galvanized Scaffolding Pipe British Drop Forged Half Coupler/Single Coupler

Shandong Shlomi Machinery Co., Ltd.
$730.00 10 Tons(MOQ)

Construction Equipment Tools Manufacturer Concrete Formwork Competitive Price Solid Steel Formwork

Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd.
$1450.00 1 Set(MOQ)

Customized Trench Box for Easy Installation in Economic Leisure Facilities Sell Well

Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
$125.00 500 Square Meters(MOQ)

Steel Plywood and Aluminium Concrete Formwork Flexible Slab Formwork for Construction

Yizheng Hengsheng Machinery Co., Ltd.
$800.00 400 Square Meters(MOQ)

Formwork Aluminium for High-Rise Building

TANGSHAN XINGHE TRADE CO., LTD.
$120.00 100 Square Meters(MOQ)

Lianggong Customized Steel Frame Wall Formwork for Construction Material

YANCHENG LIANGGONG FORMWORK CO., LTD.
$12.00 1000 Pieces(MOQ)

Metal Heavy Duty Adjustable Shoring Posts Construction Adjustable Steel Props Jack

TIANJIN FRIEND STEEL TUBE CO., LTD.