Steel Formwork for Capping in Construction

Price $1050.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Beijing, China
Popularity 303 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
  • Beijing, China
  • Tom (Mr.)  
Yes
One Year
ISO
Steel
Tunnel Formwork
Yes
Yes
AOYU
Container
China
7308900000
Product Description
1, company introduction
Beijing Aoyu Formwork Co., Ltd., established in 1992, shines as a paragon of innovation and excellence within the construction industry. As a cutting-edge enterprise, we excel in the research, development, design, production, sales, and leasing of top-tier building formwork. Boasting an impressive portfolio of over 50 national patented technologies, our products are indispensable to numerous large-scale construction projects, both locally and globally. Our trailblazing 'assembled all-steel large formwork' has garnered the esteemed title of 'national key product' and is extensively employed in prestigious construction projects. Through our unwavering dedication to superior product quality and professional service, Aoyu has cemented its leadership in the domestic formwork industry, earning widespread acclaim and industry recognition.
2, Product introduction
The capping beam formwork is a sophisticated assembly comprising a steel hoop, supporting beam, and steel formwork. The steel hoop, crafted from robust 12 mm thick steel plate, is complemented by an I-beam support. The formwork itself is a three-layer construct featuring a panel, rib, and back. Depending on the structural requirements, it can be classified into orthogonal and oblique capping beams. Designed for optimal performance, the capping beam side formwork is set in large blocks to minimize vertical seams and enhance surface quality. The panel's surface must be impeccably smooth, free from scars and corrosion. Weld treatments should be seamless and without noticeable traces. The flatness deviation must not exceed 2mm, and template edges should be neat and precise. The back structure layout should be pragmatic, ensuring the materials used can endure multiple cycles of disassembly, storage, and turnover without deformation. Formwork bracing bolts should be strategically placed along the upper and lower edges to prevent setting bolts within the concrete, with each bolt crafted from round steel bars of at least 16 mm in diameter and spaced appropriately to meet construction demands.
Beijing airport high-speed capping beam
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1050.00 1 Ton(MOQ)

Viaduct Structural Column Steel Formwork System

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Steel Formwork System for Viaduct Columns

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Customizable Steel Formwork for Viaduct Columns

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Formwork Support for Concrete Single-Sided Construction

Beijing Aoyu template Co., Ltd.
$1300.00 2 Sets(MOQ)

Yancheng Lianggong Formwork Trench Box Aluminum Shoring

YANCHENG LIANGGONG FORMWORK CO., LTD.
$56.69 100 Square Meters(MOQ)

Combined Ribbed Plastic Building Formwork 10cm Wide

Hebei Leige Technology Development Co., Ltd.
$499.00 300 Sets(MOQ)

Popular High-Quality Steel Adjustable Cantilever Climbing Formwork for Wall Bridge Dam Construction

Jiangsu Lianggong Construction Formwork Co., Ltd.
$56.69 100 Square Meters(MOQ)

Green Environmental Protection Building Template 5 Cm Thick and 30 Cm Wide

Hebei Leige Technology Development Co., Ltd.
$42.52 100 Square Meters(MOQ)

Concrete Cylindrical Formwork for Construction

Hebei Leige Technology Development Co., Ltd.
$56.69 100 Square Meters(MOQ)

New Composite Materials Innovative Building Plastic Formwork 5× 30cm

Hebei Leige Technology Development Co., Ltd.