Steel Frame for Steel Structure Building Warehouse Prefab Factory Building Workshop Shed

Price $70.00 Compare
Min Order 500 Square Meters
Availability In Stock
Shipping From Shandong, China
Popularity 273 people viewed
Quantity
+-
 

Sinomega House (Qingdao) Co., Ltd.

VIP   Audited Supplier 9 years
Profile Certified by SGS/BV
RCB
Timely Response
Cold Storage Warehouse
H-Section Steel
Within 15 Days
Light Portal Frame Structure
Prefabricated Steel Parts
Customized
ISO, CE, SGS, BV
H-Section Q345 Steel
C or Z Section Q235 Steel
GB, ASTM, DIN, JIS, AISI, BS
Hot-Rolled Steel
Bolt Connection
H-Section Steel
Steel Workshop, Steel Structure Platform
Steel Frame and Girt, Cladding Systeme, Purline
Q235 Q345
AAC/Alc Panel or Sandwich Panel
Yuanda, Q345
Load in Bulk or 20gp, 40gp, 40hq
As per requirements or standard
China
9406000090
Product Description
Steel Frame for Steel Structure Building Warehouse Prefab Factory Building Workshop Shed
Product Description

 

 

 
Advantages for autoclaved lightweight concrete panel steel structure workshop
Wide span: single span or multiple spans, the max span is 36m without middle column.
Low cost: unit price range from USD 35/m2 to 70/m2 according to clients' requirements.
Easy installation and short time for construction: Save the labor and cost for clients.
Long using lifespan: up to 50 years
Environmental protection: there is no harmful materials for this kind of building
Stable structure: anti-earthquake, wind resistance and snow resistance.
Others such as water proofing, heat proofing and energy conserving 
Our service:
Different kinds of professional team such as engineer team, production team, quality inspection team and installation team etc. guarantee to meet your requirements.
Free for AAC panel sample to dispel your misgivings
All-the-way tracking for our products till you finish the installation.Long time warranty for insurance
Professional installation team including engineers will assist client to finish the whole project in your country, or we will supply full service for installation.
Customized design is welcome. Please provide data listed below in advance:
1Location (where will be built) ?_____country, area 
2Size: length*width*height?_____m*_____m*_____m
3wind load (or max. wind speed)?_____km/h
4snow load (or max. snow height)?_____kn/m2, _____mm
5anti-earthquake _____level ?  
6Usage of the building? 
7roof panel and wall panel?You could choose sanwich panel, EPS, fiberglass wool, rockwool, PU sandwich. You could choose corrugated steel sheet and glass wool installed together on site  either.
8brickwall needed or not?If yes, 1.2m high or 1.5m high ?
9crane needed or not?If yes, _____units, max. lifting weight____tons; max. lifting height _____m
Pre-Fabricated Steel Structure Warehouse

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$99.00 22 Square Meters(MOQ)

Hot Steel Chinese Factory Easy Installation Steel Structure Agriculture Building

Sinomega House (Qingdao) Co., Ltd.
$260.00 30 Square Meters(MOQ)

Approved Modified Prefab House Shipping Efficient Expandable Beautiful Design Modern Container House for Sale

Sinomega House (Qingdao) Co., Ltd.
$70.00 500 Square Meters(MOQ)

Steel Frame for Steel Structure Building Warehouse Prefab Factory Building Workshop Shed

Sinomega House (Qingdao) Co., Ltd.
$260.00 30 Square Meters(MOQ)

2 Bedroom Prefab Houses Cheap Prefab Affordable Housing

Sinomega House (Qingdao) Co., Ltd.
$60.00 500 Square Meters(MOQ)

Steel Shed Metal Construction Frame Workshop Warehouse Prefabricated Building Steel Structure

Weifang Tailai Steel Structure Engineering Co., Ltd.
$45.00 10 Square Meters(MOQ)

Autocad, Tekla Multi-Storey Yuanfang Pallet and Shipping in Container Steel Structure Warehouse

Zhejiang Yuanfang Steel Structure Manufacturing Co., Ltd.
$100.00 200 Square Meters(MOQ)

Free Design High Quality Metal Frame Metal Shed Steel Structure Warehouse Steel Workshop Prefabricated Steel Industrial Building

Weifang Tailai Steel Structure Engineering Co., Ltd.
$50.00 300 Square Meters(MOQ)

Customized Prefabricated Steel Structure Buildings for Warehouse/Workshop

XIAMEN YUMI NEW MATERIAL TECHNOLOGY CO., LTD.
$8000.00 1 Set(MOQ)

Smart LED/LCD Bus Stop Shelter (HS-BS-S001) -Average Lead Time One Month

Guangzhou Huasheng Metal Materials Co., Ltd.
$80.00 300 Square Meters(MOQ)

Prefabricated Steel Structure Buildings Warehouses Workshops Material Industrial Shed

Foshan Sanshui Bingfa Metal Products Co., Ltd.