Steel and Aluminum Green Formwork for Slab Concrete

Price $130.00 Compare
Min Order 500 Square Meters
Availability In Stock
Shipping From Shandong, China
Popularity 485 people viewed
Quantity
+-
 

Qingdao Scaffolding Import and Export Co., Ltd.

VIP   Audited Supplier 18 years
Profile Certified by SGS/BV
MB1812-MB606
Graphic Design, Total Solution for Projects
More That 5 Years
Patent Certificate
Aluminum
Slab Formwork
Concorete Panels Shuttering Formwork
GF
Pallet
1.8x1.2M-0.6X0.6M
China
Product Description





Product Description

Panel - Prop early stripping Green Formwork System  -  Aluminium Formwork / Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 

SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.

 
There are 3 basic components in Green Formwork System,do not require braces:
 

1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool

 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.




  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
Negotiable 500 Square Meters(MOQ)

Aluminum Formwork System Forms Wall Slab Beam Panel Concrete Forms Molds

Qingdao Scaffolding Import and Export Co., Ltd.
$120.00 500 Square Meters(MOQ)

Hot Sale Steel Formwork Used for Concrete Pouring of Building Construction

Qingdao Scaffolding Import and Export Co., Ltd.
$80.00 100 Square Meters(MOQ)

Green Formwork Quick Release Construction Formwork for Concrete Buildings

Qingdao Scaffolding Import and Export Co., Ltd.
$120.00 500 Square Meters(MOQ)

2024 Aluminium Slab Formwork Light Weight with Early Stripping Head

Qingdao Scaffolding Import and Export Co., Ltd.
$101.00 500 Square Meters(MOQ)

Hot Sale Slab Steel Wood Zulin Tunnel Price Concrete Form Tie Rod Formwork

Beijing Zulin Formwork & Scaffolding Co., Ltd
$950.00 15 Tons(MOQ)

Reusable Adjustable Steel Square Column Formwork Mould for Square Pillar Column Form

Hebei Trico Trade Co., Ltd.
$5.90 1000 Pieces(MOQ)

Euro Form F Bar, F Profile, F Steel for Steel Formwork

Hebei Trico Trade Co., Ltd.
$1600.00 120 Tons(MOQ)

Concrete Building Construction Material Precast Bridge Steel Box Grider Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.
Negotiable 500 Square Meters(MOQ)

Early Stripping Head Steel Panel Formwork for Concrete Construction

Qingdao Scaffolding Import and Export Co., Ltd.
$80.00 100 Square Meters(MOQ)

China Hot Sales Transfer Block Wall Formwork

Jiaxing Wangzu Industrial Co., Ltd.