Taizhou Mold Factory Custom Injection Plastic Full Face Motorcycle Helmet Mould

Price $14000.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 385 people viewed
Quantity
+-
 

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

VIP   Audited Supplier 15 years
Profile Certified by SGS/BV
JSL-N0918-8
Injection Mould
Polishing
Single Cavity
ABS
Single-Process Mode
Furniture, Home Use
Hot Runner
UG
Fixed
ISO
DME
Customized
According to Customers Requirement
Professional QC
Hot or Cold Runner System
Dme
Ug, Proe, Solidworks CAD, Ect
by Experienced Designer
Automatically by CNC
S50c
Nitriding, etc
JSLMOULD
High Quality Wooden Case
DME
Huangyan, Taizhou, China
8480719090
Product Description
Product NameTaizhou Mold Factory Custom Injection Plastic Full Face Motorcycle Helmet  Mould
Product materialABS
Core& Cavity Steel718
Steel hardness:HRC34-38
Mould StandardDME, etc
Cavity NumberSingle
Injection Systemside  gate
Ejector Systemejector plate
mould base
S50C
 
Cycle Time
40S
 
Tooling lead time60DAYS
Mould life1, 000, 000SHOTS
Quality assuranceISO9001
SpecificationAccording to client' s requirements

 

 
Our Advantage         1. High quality
        2. Reasonable price
        3. On time delivery
        4. Good After-sale service
        5. Strict quality control
        6. All the mould are automotic.

 

 
Offer youIn-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.

 
 
Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.

FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA