Toothpaste Tube Heading Machine Toothpaste Tube Shoulder Equipment Toothpaste Tube Equipment Packing Production Line

Price $20000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Shanghai, China
Popularity 320 people viewed
Quantity
+-
 

Woolley Automatic Machinery Ltd. (Shanghai)

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
  • Shanghai, China
  • Woolley Tian (Mr.)  
JX-HS120B
1 Year
Tube
Electric
1 Year
85~120 Pieces Per Minute
19~60 mm
45~220 mm
25kw
4500kg
Servo Motor Control
18~23 Minutes
20~25 Minutes
30~35 Minutes
Woolley
Wood
3470*2900*2490mm
Shanghai
Product Description
Extruded Tube Line
(project solution)
line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100)
 line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100)
Laminated Tube Line
 (project solution)
line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100)
 line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50)
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.

Q2:Are you manufacturer?
Yes, We are the manufacturer.

Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc


Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.

Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.

Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$10500.00 1 Piece(MOQ)

6 Color Dry Offset Cup Printing Machine Offset Printer

Woolley Automatic Machinery Ltd. (Shanghai)
$1000.00 1 Piece(MOQ)

Lami Tube Filling and Sealing Equipment Lami Tube Machine Production Line Manufacturer

Woolley Automatic Machinery Ltd. (Shanghai)
$10500.00 1 Piece(MOQ)

Aluminum Plastic Laminated Tube Making Machine

Woolley Automatic Machinery Ltd. (Shanghai)
$10500.00 1 Piece(MOQ)

Offset Roll Printing Machine for Plastic Soft Tubes Offset Printer

Woolley Automatic Machinery Ltd. (Shanghai)
$20000.00 1 Set(MOQ)

Hydraulic Synchronization Double Head Tube End Forming Machines

Beijing Ron-En Machinery & Integration Co., Ltd.
$9000.00 1 Piece(MOQ)

Low Noise Steel Pipe Tapering Machine for Furniture Chair Legs

ZHANGJIAGANG YUETAI MACHINERY SCIENCE TECHNOLOGY CO.,LTD.
$86000.00 1 Set(MOQ)

HDPE PPR PP PVC Pipe Machine Plastic Line Pipe Socket Machine Water Electric Conduit Pipe Belling Machine Plastic Machine Pipe Socketing

Suzhou Demasun Rubber&Plastic Machinery Co., Ltd.
$26999.00 1 Set(MOQ)

CNC Large Diameter Solar Ground Screw Cone Tube Machine

Dongguan Jixin Machinery Co., Ltd.
$5999.00 1 Set(MOQ)

Advanced Manual Rotary Forging Cone Tube Machine

Dongguan Jixin Machinery Co., Ltd.
$42000.00 1 Piece(MOQ)

35-60mm High Speed Table Desk Drawer Channel Railway Slide Making Machine Roll Forming Machine Equipment

Foshan Wenzhichang Machine Factory